News (NWSA) Construction in Progress (2016 - 2025)
Historic Construction in Progress for News (NWSA) over the last 13 years, with Q2 2025 value amounting to $113.0 million.
- News' Construction in Progress rose 3139.53% to $113.0 million in Q2 2025 from the same period last year, while for Jun 2025 it was $113.0 million, marking a year-over-year increase of 3139.53%. This contributed to the annual value of $113.0 million for FY2025, which is 3139.53% up from last year.
- According to the latest figures from Q2 2025, News' Construction in Progress is $113.0 million, which was up 3139.53% from $86.0 million recorded in Q2 2024.
- News' Construction in Progress' 5-year high stood at $275.0 million during Q2 2023, with a 5-year trough of $86.0 million in Q2 2024.
- Moreover, its 5-year median value for Construction in Progress was $179.0 million (2021), whereas its average is $174.6 million.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 5565.22% in 2021, then plummeted by 6872.73% in 2024.
- Quarter analysis of 5 years shows News' Construction in Progress stood at $179.0 million in 2021, then rose by 22.91% to $220.0 million in 2022, then rose by 25.0% to $275.0 million in 2023, then tumbled by 68.73% to $86.0 million in 2024, then surged by 31.4% to $113.0 million in 2025.
- Its last three reported values are $113.0 million in Q2 2025, $86.0 million for Q2 2024, and $275.0 million during Q2 2023.