KPIs & Operating Metrics(New)
Growth Metrics

Paccar (PCAR) Construction in Progress (2016 - 2025)

Paccar (PCAR) has disclosed Construction in Progress for 16 consecutive years, with $1.0 billion as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 37.85% to $1.0 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.0 billion through Dec 2025, up 37.85% year-over-year, with the annual reading at $1.0 billion for FY2025, 37.85% up from the prior year.
  • Construction in Progress for Q4 2025 was $1.0 billion at Paccar, up from $746.1 million in the prior quarter.
  • The five-year high for Construction in Progress was $1.0 billion in Q4 2025, with the low at $313.9 million in Q4 2021.
  • Average Construction in Progress over 5 years is $637.8 million, with a median of $676.3 million recorded in 2023.
  • The sharpest move saw Construction in Progress crashed 70.98% in 2021, then surged 59.47% in 2023.
  • Over 5 years, Construction in Progress stood at $313.9 million in 2021, then skyrocketed by 35.11% to $424.1 million in 2022, then surged by 59.47% to $676.3 million in 2023, then rose by 10.32% to $746.1 million in 2024, then surged by 37.85% to $1.0 billion in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $1.0 billion, $746.1 million, and $676.3 million for Q4 2025, Q4 2024, and Q4 2023 respectively.