KPIs & Operating Metrics(New)
Growth Metrics

Paccar (PCAR) Construction in Progress (2016 - 2025)

Paccar (PCAR) has disclosed Construction in Progress for 16 consecutive years, with $1.0 billion as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 37.85% to $1.0 billion in Q4 2025 year-over-year; TTM through Dec 2025 was $1.0 billion, a 37.85% increase, with the full-year FY2025 number at $1.0 billion, up 37.85% from a year prior.
  • Construction in Progress was $1.0 billion for Q4 2025 at Paccar, up from $746.1 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $1.0 billion in Q4 2025 to a low of $313.9 million in Q4 2021.
  • A 5-year average of $637.8 million and a median of $676.3 million in 2023 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 70.98% in 2021, then skyrocketed 59.47% in 2023.
  • Paccar's Construction in Progress stood at $313.9 million in 2021, then soared by 35.11% to $424.1 million in 2022, then skyrocketed by 59.47% to $676.3 million in 2023, then increased by 10.32% to $746.1 million in 2024, then skyrocketed by 37.85% to $1.0 billion in 2025.
  • Per Business Quant, the three most recent readings for PCAR's Construction in Progress are $1.0 billion (Q4 2025), $746.1 million (Q4 2024), and $676.3 million (Q4 2023).