Growth Metrics

Paychex (PAYX) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Paychex (PAYX) over the last 8 years, with Q3 2018 value amounting to $33.2 million.

  • Paychex's Construction in Progress changed N/A to $33.2 million in Q3 2018 from the same period last year, while for Aug 2018 it was $33.2 million, marking a year-over-year change of. This contributed to the annual value of $32.0 million for FY2018, which is N/A changed from last year.
  • According to the latest figures from Q3 2018, Paychex's Construction in Progress is $33.2 million.
  • Over the past 5 years, Paychex's Construction in Progress peaked at $33.2 million during Q3 2018, and registered a low of $13.9 million during Q1 2014.
  • Its 4-year average for Construction in Progress is $26.3 million, with a median of $28.4 million in 2014.
  • Per our database at Business Quant, Paychex's Construction in Progress tumbled by 5487.01% in 2014 and then soared by 13453.24% in 2015.
  • Over the past 4 years, Paychex's Construction in Progress (Quarter) stood at $28.6 million in 2014, then plummeted by 36.01% to $18.3 million in 2015, then dropped by 12.57% to $16.0 million in 2016, then skyrocketed by 107.5% to $33.2 million in 2018.
  • Its last three reported values are $33.2 million in Q3 2018, $32.0 million for Q2 2018, and $31.5 million during Q1 2018.