Growth Metrics

Oracle (ORCL) Construction in Progress (2016 - 2025)

Oracle's Construction in Progress history spans 16 years, with the latest figure at $16.5 billion for Q2 2025.

  • For Q2 2025, Construction in Progress rose 193.04% year-over-year to $16.5 billion; the TTM value through May 2025 reached $16.5 billion, up 193.04%, while the annual FY2025 figure was $16.5 billion, 193.04% up from the prior year.
  • Construction in Progress reached $16.5 billion in Q2 2025 per ORCL's latest filing, up from $5.6 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $16.5 billion in Q2 2025 to a low of $233.0 million in Q2 2021.
  • Average Construction in Progress over 5 years is $5.3 billion, with a median of $3.8 billion recorded in 2023.
  • Peak YoY movement for Construction in Progress: decreased 16.79% in 2021, then soared 651.17% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $233.0 million in 2021, then soared by 119.74% to $512.0 million in 2022, then skyrocketed by 651.17% to $3.8 billion in 2023, then soared by 46.49% to $5.6 billion in 2024, then skyrocketed by 193.04% to $16.5 billion in 2025.
  • Per Business Quant, the three most recent readings for ORCL's Construction in Progress are $16.5 billion (Q2 2025), $5.6 billion (Q2 2024), and $3.8 billion (Q2 2023).