Netstreit (NTST) Construction in Progress (2021 - 2026)
Netstreit (NTST) has disclosed Construction in Progress for 6 consecutive years, with $10.9 million as the latest value for Q1 2026.
- For Q1 2026, Construction in Progress rose 249.95% year-over-year to $10.9 million; the TTM value through Mar 2026 reached $10.9 million, up 249.95%, while the annual FY2025 figure was $5.5 million, 10.1% down from the prior year.
- Construction in Progress was $10.9 million for Q1 2026 at Netstreit, up from $5.5 million in the prior quarter.
- The five-year high for Construction in Progress was $33.5 million in Q3 2023, with the low at $1.8 million in Q2 2025.
- Historically, Construction in Progress has averaged $13.9 million across 5 years, with a median of $12.8 million in 2022.
- The largest annual shift saw Construction in Progress skyrocketed 1255.57% in 2022 before it plummeted 89.45% in 2025.
- Over 5 years, Construction in Progress stood at $16.8 million in 2022, then soared by 73.84% to $29.2 million in 2023, then tumbled by 79.05% to $6.1 million in 2024, then decreased by 10.1% to $5.5 million in 2025, then skyrocketed by 97.82% to $10.9 million in 2026.
- Per Business Quant database, its latest 3 readings for Construction in Progress were $10.9 million in Q1 2026, $5.5 million in Q4 2025, and $1.8 million in Q3 2025.