North American Construction NOA
NYSE NOA
$13.65 +0.09 (+0.63%)
As of: Aug 21, 2026 · 10:33 AM EDT

North American Construction (NOA) EPS (Basic) (2009 - 2026)

North American Construction's (NOA) quarterly EPS (Basic) came in at $0.1 in Q1 2026, down 54.94% YoY from $0.22 in Q1 2025, and up 268.68% on a QoQ basis from -$0.06 in Q4 2025.

North American Construction (NOA) EPS (Basic) (2009 - 2026) Analysis & Trends

North American Construction (NOA) has 18 years of EPS (Basic) data on file, last reported at $0.1 in Q1 2026.

  • Quarterly EPS (Basic) fell 54.94% year-over-year to $0.1 in Q1 2026, while the trailing twelve-month figure through Mar 2026 was $1.02 (down 37.58% YoY) and the FY2025 annual result came in at $0.62, down 64.04% from the prior year.
  • EPS (Basic) advanced to $0.1 in Q1 2026, from -$0.06 in the prior quarter.
  • In the past five years, EPS (Basic) ranged from a high of $0.87 in Q4 2022 to a low of -$0.06 in Q4 2025.
  • A 5-year average of $0.43 and a median of $0.41 in 2025 frame the typical range for EPS (Basic).
  • Annual changes were most pronounced in 2022 — EPS (Basic) jumped 137.04% — and 2025, when it tumbled 119.66%.
  • Tracing NOA's EPS (Basic) over 5 years: stood at $0.87 in 2022, then declined by 21.19% to $0.69 in 2023, then slumped by 55.73% to $0.31 in 2024, then plunged by 119.66% to -$0.06 in 2025, then jumped by 268.68% to $0.1 in 2026.
  • The last three EPS (Basic) figures came in at $0.1 (Q1 2026), -$0.06 (Q4 2025), and $0.63 (Q3 2025), per Business Quant data.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) EPS (Basic) (Qtr)
1 Slb 79.57 Bn 75.50 Bn 4.63 Bn 0.55
2 Baker Hughes 62.26 Bn 46.53 Bn 1.58 Bn 0.69
3 Tenaris 53.10 Bn 44.08 Bn 984.66 472,433.45
4 TechnipFMC 30.79 Bn 29.55 Bn 1.40 Bn 0.92
5 Halliburton 29.47 Bn 27.43 Bn 2.10 Bn 0.64
6 Nov 7.26 Bn 6.09 Bn 521.00 Mn 0.32
7 Weatherford International 6.52 Bn 5.38 Bn 662.00 Mn 0.58
8 Kodiak Gas Services 5.64 Bn 5.50 Bn 246.76 Mn 0.55
9 Archrock 5.51 Bn 5.51 Bn 244.51 Mn 0.39
10 North American Construction 373.11 Mn 251.90 Mn 31.38 Mn 0.34

Historic Data

Download Data
DateValue
Mar 31, 2026 0.10
Dec 31, 2025 -0.06
Sep 30, 2025 0.63
Jun 30, 2025 0.41
Mar 31, 2025 0.22
Dec 31, 2024 0.31
Sep 30, 2024 0.52
Jun 30, 2024 0.58
Mar 31, 2024 0.33
Dec 31, 2023 0.69
Sep 30, 2023 0.29
Jun 30, 2023 0.37
Mar 31, 2023 0.79
Dec 31, 2022 0.87
Sep 30, 2022 0.51
Jun 30, 2022 0.20
Mar 31, 2022 0.47
Dec 31, 2021 0.49
Sep 30, 2021 0.45
Jun 30, 2021 0.08