Growth Metrics

Neuroone Medical Technologies (NMTC) Construction in Progress (2024 - 2025)

Historic Construction in Progress for Neuroone Medical Technologies (NMTC) over the last 2 years, with Q4 2025 value amounting to $135244.0.

  • Neuroone Medical Technologies' Construction in Progress changed N/A to $135244.0 in Q4 2025 from the same period last year, while for Dec 2025 it was $135244.0, marking a year-over-year change of. This contributed to the annual value of $130100.0 for FY2025, which is 3236.64% down from last year.
  • As of Q4 2025, Neuroone Medical Technologies' Construction in Progress stood at $135244.0.
  • In the past 5 years, Neuroone Medical Technologies' Construction in Progress ranged from a high of $192360.0 in Q3 2024 and a low of $130100.0 during Q3 2025