Nektar Therapeutics (NKTR) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Nektar Therapeutics (NKTR) over the last 15 years, with Q4 2024 value amounting to $245000.0.
- Nektar Therapeutics' Construction in Progress fell 6684.71% to $245000.0 in Q4 2024 from the same period last year, while for Dec 2024 it was $245000.0, marking a year-over-year decrease of 6684.71%. This contributed to the annual value of $245000.0 for FY2024, which is 6684.71% down from last year.
- Latest data reveals that Nektar Therapeutics reported Construction in Progress of $245000.0 as of Q4 2024, which was down 6684.71% from $138000.0 recorded in Q3 2024.
- In the past 5 years, Nektar Therapeutics' Construction in Progress registered a high of $7.2 million during Q4 2021, and its lowest value of $138000.0 during Q3 2024.
- For the 5-year period, Nektar Therapeutics' Construction in Progress averaged around $1.8 million, with its median value being $731500.0 (2023).
- Over the last 5 years, Nektar Therapeutics' Construction in Progress had its largest YoY gain of 5704.99% in 2024, and its largest YoY loss of 7172.13% in 2024.
- Nektar Therapeutics' Construction in Progress (Quarter) stood at $4.7 million in 2020, then skyrocketed by 52.4% to $7.2 million in 2021, then tumbled by 64.68% to $2.5 million in 2022, then plummeted by 70.79% to $739000.0 in 2023, then tumbled by 66.85% to $245000.0 in 2024.
- Its Construction in Progress stands at $245000.0 for Q4 2024, versus $138000.0 for Q3 2024 and $724000.0 for Q2 2024.