Nektar Therapeutics (NKTR) Construction in Progress: 2010-2024
Historic Construction in Progress for Nektar Therapeutics (NKTR) over the last 2 years, with Dec 2024 value amounting to $245,000.
- Nektar Therapeutics' Construction in Progress fell 66.85% to $245,000 in Q4 2024 from the same period last year, while for Dec 2024 it was $245,000, marking a year-over-year decrease of 66.85%. This contributed to the annual value of $245,000 for FY2024, which is 66.85% down from last year.
- Latest data reveals that Nektar Therapeutics reported Construction in Progress of $245,000 as of Q4 2024, which was up 77.54% from $138,000 recorded in Q3 2024.
- Nektar Therapeutics' 5-year Construction in Progress high stood at $7.2 million for Q4 2021, and its period low was $138,000 during Q3 2024.
- Moreover, its 3-year median value for Construction in Progress was $606,000 (2023), whereas its average is $767,000.
- Over the last 5 years, Nektar Therapeutics' Construction in Progress had its largest YoY gain of 57.05% in 2024, and its largest YoY loss of 71.72% in 2024.
- Nektar Therapeutics' Construction in Progress (Quarterly) stood at $4.7 million in 2020, then surged by 52.40% to $7.2 million in 2021, then tumbled by 64.68% to $2.5 million in 2022, then slumped by 70.79% to $739,000 in 2023, then tumbled by 66.85% to $245,000 in 2024.
- Its Construction in Progress was $245,000 in Q4 2024, compared to $138,000 in Q3 2024 and $724,000 in Q2 2024.