Growth Metrics

National CineMedia (NCMI) Construction in Progress (2016 - 2024)

Historic Construction in Progress for National CineMedia (NCMI) over the last 13 years, with Q4 2024 value amounting to $2.8 million.

  • National CineMedia's Construction in Progress rose 11538.46% to $2.8 million in Q4 2024 from the same period last year, while for Dec 2024 it was $2.8 million, marking a year-over-year increase of 11538.46%. This contributed to the annual value of $2.8 million for FY2024, which is 11538.46% up from last year.
  • Latest data reveals that National CineMedia reported Construction in Progress of $2.8 million as of Q4 2024, which was up 11538.46% from $1.3 million recorded in Q4 2023.
  • In the past 5 years, National CineMedia's Construction in Progress ranged from a high of $8.3 million in Q4 2020 and a low of $1.1 million during Q4 2022
  • Its 5-year average for Construction in Progress is $3.0 million, with a median of $1.4 million in 2021.
  • In the last 5 years, National CineMedia's Construction in Progress tumbled by 8313.25% in 2021 and then surged by 11538.46% in 2024.
  • Over the past 5 years, National CineMedia's Construction in Progress (Quarter) stood at $8.3 million in 2020, then tumbled by 83.13% to $1.4 million in 2021, then fell by 21.43% to $1.1 million in 2022, then rose by 18.18% to $1.3 million in 2023, then surged by 115.38% to $2.8 million in 2024.
  • Its Construction in Progress stands at $2.8 million for Q4 2024, versus $1.3 million for Q4 2023 and $1.1 million for Q4 2022.