Growth Metrics

Northann (NCL) Construction in Progress (2022 - 2025)

Northann's Construction in Progress history spans 4 years, with the latest figure at $2.1 million for Q4 2025.

  • Quarterly results put Construction in Progress at $2.1 million for Q4 2025, up 69.01% from a year ago — trailing twelve months through Dec 2025 was $2.1 million (up 69.01% YoY), and the annual figure for FY2025 was $2.1 million, up 69.01%.
  • Construction in Progress for Q4 2025 was $2.1 million at Northann, down from $2.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $2.2 million in Q3 2025 to a low of $942754.0 in Q3 2023.
  • The 4-year median for Construction in Progress is $1.3 million (2024), against an average of $1.4 million.
  • The sharpest move saw Construction in Progress decreased 0.98% in 2023, then soared 70.14% in 2025.
  • Year by year, Construction in Progress stood at $971884.0 in 2022, then dropped by 0.98% to $962338.0 in 2023, then skyrocketed by 30.8% to $1.3 million in 2024, then skyrocketed by 69.01% to $2.1 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $2.1 million, $2.2 million, and $2.1 million for Q4 2025, Q3 2025, and Q2 2025 respectively.