Growth Metrics

Millerknoll (MLKN) Construction in Progress (2016 - 2019)

Historic Construction in Progress for Millerknoll (MLKN) over the last 10 years, with Q2 2019 value amounting to $59.9 million.

  • Millerknoll's Construction in Progress rose 363.32% to $59.9 million in Q2 2019 from the same period last year, while for Jun 2019 it was $59.9 million, marking a year-over-year increase of 363.32%. This contributed to the annual value of $59.9 million for FY2019, which is 363.32% up from last year.
  • According to the latest figures from Q2 2019, Millerknoll's Construction in Progress is $59.9 million, which was up 363.32% from $57.8 million recorded in Q2 2018.
  • Millerknoll's 5-year Construction in Progress high stood at $59.9 million for Q2 2019, and its period low was $48.2 million during Q2 2015.
  • Over the past 5 years, Millerknoll's median Construction in Progress value was $53.9 million (recorded in 2016), while the average stood at $54.6 million.
  • As far as peak fluctuations go, Millerknoll's Construction in Progress skyrocketed by 6120.4% in 2015, and later tumbled by 111.32% in 2017.
  • Quarter analysis of 5 years shows Millerknoll's Construction in Progress stood at $48.2 million in 2015, then grew by 11.83% to $53.9 million in 2016, then fell by 1.11% to $53.3 million in 2017, then grew by 8.44% to $57.8 million in 2018, then increased by 3.63% to $59.9 million in 2019.
  • Its Construction in Progress stands at $59.9 million for Q2 2019, versus $57.8 million for Q2 2018 and $53.3 million for Q2 2017.