Growth Metrics

Interface (TILE) Construction in Progress (2021 - 2023)

Historic Construction in Progress for Interface (TILE) over the last 3 years, with Q1 2023 value amounting to $24.1 million.

  • Interface's Construction in Progress fell 4596.41% to $24.1 million in Q1 2023 from the same period last year, while for Jan 2023 it was $24.1 million, marking a year-over-year decrease of 4596.41%. This contributed to the annual value of $24.1 million for FY2023, which is 4596.41% down from last year.
  • As of Q1 2023, Interface's Construction in Progress stood at $24.1 million, which was down 4596.41% from $44.6 million recorded in Q1 2022.
  • Interface's Construction in Progress' 5-year high stood at $44.6 million during Q1 2022, with a 5-year trough of $24.1 million in Q1 2023.
  • Moreover, its 3-year median value for Construction in Progress was $43.0 million (2021), whereas its average is $37.2 million.
  • As far as peak fluctuations go, Interface's Construction in Progress soared by 372.09% in 2022, and later plummeted by 4596.41% in 2023.
  • Quarter analysis of 3 years shows Interface's Construction in Progress stood at $43.0 million in 2021, then rose by 3.72% to $44.6 million in 2022, then tumbled by 45.96% to $24.1 million in 2023.
  • Its last three reported values are $24.1 million in Q1 2023, $44.6 million for Q1 2022, and $43.0 million during Q1 2021.