Growth Metrics

Hni (HNI) Construction in Progress (2016 - 2026)

Hni (HNI) has disclosed Construction in Progress for 16 consecutive years, with $31.2 million as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress rose 50.72% to $31.2 million in Q3 2025 year-over-year; TTM through Sep 2025 was $31.2 million, a 50.72% increase, with the full-year FY2024 number at $25.9 million, up 16.67% from a year prior.
  • Construction in Progress was $31.2 million for Q3 2025 at Hni, up from $29.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $41.7 million in Q3 2023 to a low of $17.8 million in Q1 2021.
  • A 5-year average of $27.8 million and a median of $26.7 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: soared 114.81% in 2021, then crashed 45.23% in 2024.
  • Hni's Construction in Progress stood at $26.1 million in 2021, then surged by 31.12% to $34.2 million in 2022, then crashed by 35.09% to $22.2 million in 2023, then rose by 16.67% to $25.9 million in 2024, then increased by 20.46% to $31.2 million in 2025.
  • Per Business Quant, the three most recent readings for HNI's Construction in Progress are $31.2 million (Q3 2025), $29.9 million (Q2 2025), and $26.5 million (Q1 2025).