Hni (HNI) Construction in Progress (2016 - 2026)
Hni (HNI) has disclosed Construction in Progress for 17 consecutive years, with $58.5 million as the latest value for Q1 2026.
- Quarterly Construction in Progress rose 125.87% to $58.5 million in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $58.5 million through Jan 2026, up 125.87% year-over-year, with the annual reading at $58.5 million for FY2026, 125.87% up from the prior year.
- Construction in Progress for Q1 2026 was $58.5 million at Hni, up from $31.2 million in the prior quarter.
- The five-year high for Construction in Progress was $58.5 million in Q1 2026, with the low at $20.7 million in Q3 2024.
- Average Construction in Progress over 5 years is $30.9 million, with a median of $29.7 million recorded in 2022.
- The sharpest move saw Construction in Progress plummeted 45.23% in 2024, then surged 125.87% in 2026.
- Over 5 years, Construction in Progress stood at $34.2 million in 2022, then plummeted by 35.09% to $22.2 million in 2023, then grew by 16.67% to $25.9 million in 2024, then rose by 20.46% to $31.2 million in 2025, then soared by 87.5% to $58.5 million in 2026.
- According to Business Quant data, Construction in Progress over the past three periods came in at $58.5 million, $31.2 million, and $29.9 million for Q1 2026, Q3 2025, and Q2 2025 respectively.