Magnachip Semiconductor (MX) Construction in Progress (2020 - 2025)
Historic Construction in Progress for Magnachip Semiconductor (MX) over the last 6 years, with Q3 2025 value amounting to $15.0 million.
- Magnachip Semiconductor's Construction in Progress rose 43349.95% to $15.0 million in Q3 2025 from the same period last year, while for Sep 2025 it was $15.0 million, marking a year-over-year increase of 43349.95%. This contributed to the annual value of $2.7 million for FY2024, which is 591.88% up from last year.
- Per Magnachip Semiconductor's latest filing, its Construction in Progress stood at $15.0 million for Q3 2025, which was up 43349.95% from $12.3 million recorded in Q2 2025.
- Magnachip Semiconductor's Construction in Progress' 5-year high stood at $25.8 million during Q4 2021, with a 5-year trough of $1.2 million in Q2 2023.
- Moreover, its 5-year median value for Construction in Progress was $2.8 million (2024), whereas its average is $10.4 million.
- As far as peak fluctuations go, Magnachip Semiconductor's Construction in Progress crashed by 9545.74% in 2023, and later surged by 49099.23% in 2025.
- Over the past 5 years, Magnachip Semiconductor's Construction in Progress (Quarter) stood at $25.8 million in 2021, then tumbled by 90.36% to $2.5 million in 2022, then increased by 3.82% to $2.6 million in 2023, then grew by 5.92% to $2.7 million in 2024, then skyrocketed by 447.33% to $15.0 million in 2025.
- Its Construction in Progress stands at $15.0 million for Q3 2025, versus $12.3 million for Q2 2025 and $4.4 million for Q1 2025.