Magnachip Semiconductor (MX) Construction in Progress (2020 - 2025)
Magnachip Semiconductor (MX) has disclosed Construction in Progress for 6 consecutive years, with $22.5 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 720.45% to $22.5 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $22.5 million through Dec 2025, up 720.45% year-over-year, with the annual reading at $22.5 million for FY2025, 720.45% up from the prior year.
- Construction in Progress for Q4 2025 was $22.5 million at Magnachip Semiconductor, up from $15.0 million in the prior quarter.
- The five-year high for Construction in Progress was $25.8 million in Q4 2021, with the low at $1.2 million in Q2 2023.
- Average Construction in Progress over 5 years is $11.0 million, with a median of $3.6 million recorded in 2024.
- The sharpest move saw Construction in Progress plummeted 95.46% in 2023, then skyrocketed 720.45% in 2025.
- Over 5 years, Construction in Progress stood at $25.8 million in 2021, then tumbled by 90.36% to $2.5 million in 2022, then grew by 3.82% to $2.6 million in 2023, then rose by 5.92% to $2.7 million in 2024, then surged by 720.45% to $22.5 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $22.5 million, $15.0 million, and $12.3 million for Q4 2025, Q3 2025, and Q2 2025 respectively.