Growth Metrics

Vail Resorts (MTN) Construction in Progress (2016 - 2026)

Vail Resorts filings provide 17 years of Construction in Progress readings, the most recent being $61.3 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 18.81% to $61.3 million in Q1 2026 year-over-year; TTM through Jan 2026 was $61.3 million, a 18.81% decrease, with the full-year FY2025 number at $114.4 million, up 7.87% from a year prior.
  • Construction in Progress hit $61.3 million in Q1 2026 for Vail Resorts, down from $183.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $222.0 million in Q4 2022 to a low of $61.3 million in Q1 2026.
  • Median Construction in Progress over the past 5 years was $114.4 million (2025), compared with a mean of $123.4 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 109.44% in 2022 and later tumbled 44.9% in 2024.
  • Vail Resorts' Construction in Progress stood at $222.0 million in 2022, then decreased by 16.56% to $185.2 million in 2023, then dropped by 10.29% to $166.2 million in 2024, then grew by 10.68% to $183.9 million in 2025, then plummeted by 66.67% to $61.3 million in 2026.
  • The last three reported values for Construction in Progress were $61.3 million (Q1 2026), $183.9 million (Q4 2025), and $114.4 million (Q3 2025) per Business Quant data.