KPIs & Operating Metrics(New)
Growth Metrics

Wynn Resorts (WYNN) Construction in Progress (2016 - 2025)

Wynn Resorts' Construction in Progress history spans 17 years, with the latest figure at $350.3 million for Q4 2025.

  • For Q4 2025, Construction in Progress rose 21.87% year-over-year to $350.3 million; the TTM value through Dec 2025 reached $350.3 million, up 21.87%, while the annual FY2025 figure was $350.3 million, 21.87% up from the prior year.
  • Construction in Progress reached $350.3 million in Q4 2025 per WYNN's latest filing, up from $314.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $369.2 million in Q1 2025 to a low of $112.0 million in Q4 2022.
  • Average Construction in Progress over 5 years is $228.1 million, with a median of $209.7 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: soared 107.88% in 2022, then tumbled 56.12% in 2023.
  • A 5-year view of Construction in Progress shows it stood at $250.4 million in 2021, then plummeted by 55.25% to $112.0 million in 2022, then skyrocketed by 45.13% to $162.6 million in 2023, then surged by 76.78% to $287.4 million in 2024, then increased by 21.87% to $350.3 million in 2025.
  • Per Business Quant, the three most recent readings for WYNN's Construction in Progress are $350.3 million (Q4 2025), $314.8 million (Q3 2025), and $293.2 million (Q2 2025).