Wynn Resorts (WYNN) Construction in Progress (2016 - 2026)

Wynn Resorts filings provide 17 years of Construction in Progress readings, the most recent being $350.3 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 21.87% to $350.3 million in Q4 2025 year-over-year; TTM through Dec 2025 was $350.3 million, a 21.87% increase, with the full-year FY2025 number at $350.3 million, up 21.87% from a year prior.
  • Construction in Progress hit $350.3 million in Q4 2025 for Wynn Resorts, up from $314.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $369.2 million in Q1 2025 to a low of $112.0 million in Q4 2022.
  • Median Construction in Progress over the past 5 years was $209.7 million (2022), compared with a mean of $228.1 million.
  • Biggest five-year swings in Construction in Progress: skyrocketed 107.88% in 2022 and later crashed 56.12% in 2023.
  • Wynn Resorts' Construction in Progress stood at $250.4 million in 2021, then plummeted by 55.25% to $112.0 million in 2022, then skyrocketed by 45.13% to $162.6 million in 2023, then surged by 76.78% to $287.4 million in 2024, then increased by 21.87% to $350.3 million in 2025.
  • The last three reported values for Construction in Progress were $350.3 million (Q4 2025), $314.8 million (Q3 2025), and $293.2 million (Q2 2025) per Business Quant data.