KPIs & Operating Metrics(New)
Growth Metrics

Wynn Resorts (WYNN) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Wynn Resorts (WYNN) over the last 17 years, with Q3 2025 value amounting to $314.8 million.

  • Wynn Resorts' Construction in Progress rose 3444.73% to $314.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $314.8 million, marking a year-over-year increase of 3444.73%. This contributed to the annual value of $287.4 million for FY2024, which is 7678.36% up from last year.
  • According to the latest figures from Q3 2025, Wynn Resorts' Construction in Progress is $314.8 million, which was up 3444.73% from $293.2 million recorded in Q2 2025.
  • Wynn Resorts' 5-year Construction in Progress high stood at $369.2 million for Q1 2025, and its period low was $112.0 million during Q4 2022.
  • Its 5-year average for Construction in Progress is $221.7 million, with a median of $194.9 million in 2022.
  • As far as peak fluctuations go, Wynn Resorts' Construction in Progress soared by 10788.44% in 2022, and later plummeted by 5612.03% in 2023.
  • Over the past 5 years, Wynn Resorts' Construction in Progress (Quarter) stood at $250.4 million in 2021, then tumbled by 55.25% to $112.0 million in 2022, then skyrocketed by 45.13% to $162.6 million in 2023, then soared by 76.78% to $287.4 million in 2024, then grew by 9.51% to $314.8 million in 2025.
  • Its Construction in Progress was $314.8 million in Q3 2025, compared to $293.2 million in Q2 2025 and $369.2 million in Q1 2025.