Mediaco Holding (MDIA) Construction in Progress (2020 - 2024)
Historic Construction in Progress for Mediaco Holding (MDIA) over the last 5 years, with Q4 2024 value amounting to $1.8 million.
- Mediaco Holding's Construction in Progress rose 14378.38% to $1.8 million in Q4 2024 from the same period last year, while for Dec 2024 it was $1.8 million, marking a year-over-year increase of 14378.38%. This contributed to the annual value of $1.8 million for FY2024, which is 14378.38% up from last year.
- Latest data reveals that Mediaco Holding reported Construction in Progress of $1.8 million as of Q4 2024, which was up 14378.38% from $740000.0 recorded in Q4 2023.
- In the past 5 years, Mediaco Holding's Construction in Progress registered a high of $1.8 million during Q4 2024, and its lowest value of $31000.0 during Q4 2022.
- In the last 5 years, Mediaco Holding's Construction in Progress had a median value of $88000.0 in 2021 and averaged $540000.0.
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 6477.27% in 2022, then soared by 228709.68% in 2023.
- Mediaco Holding's Construction in Progress (Quarter) stood at $37000.0 in 2020, then skyrocketed by 137.84% to $88000.0 in 2021, then tumbled by 64.77% to $31000.0 in 2022, then surged by 2287.1% to $740000.0 in 2023, then surged by 143.78% to $1.8 million in 2024.
- Its Construction in Progress was $1.8 million in Q4 2024, compared to $740000.0 in Q4 2023 and $31000.0 in Q4 2022.