Growth Metrics

Magnera (MAGN) Construction in Progress (2016 - 2020)

Historic Construction in Progress for Magnera (MAGN) over the last 10 years, with Q4 2020 value amounting to $23.3 million.

  • Magnera's Construction in Progress fell 1198.88% to $23.3 million in Q4 2020 from the same period last year, while for Dec 2020 it was $23.3 million, marking a year-over-year decrease of 1198.88%. This contributed to the annual value of $23.3 million for FY2020, which is 1198.88% down from last year.
  • As of Q4 2020, Magnera's Construction in Progress stood at $23.3 million, which was down 1198.88% from $26.5 million recorded in Q4 2019.
  • Magnera's 5-year Construction in Progress high stood at $137.7 million for Q4 2016, and its period low was $21.9 million during Q4 2018.
  • Its 5-year average for Construction in Progress is $60.7 million, with a median of $26.5 million in 2019.
  • In the last 5 years, Magnera's Construction in Progress skyrocketed by 13469.49% in 2016 and then crashed by 7669.01% in 2018.
  • Magnera's Construction in Progress (Quarter) stood at $137.7 million in 2016, then tumbled by 31.61% to $94.1 million in 2017, then plummeted by 76.69% to $21.9 million in 2018, then increased by 20.79% to $26.5 million in 2019, then dropped by 11.99% to $23.3 million in 2020.
  • Its Construction in Progress was $23.3 million in Q4 2020, compared to $26.5 million in Q4 2019 and $21.9 million in Q4 2018.