Magnera (MAGN) Construction in Progress (2016 - 2020)
Magnera (MAGN) has disclosed Construction in Progress for 10 consecutive years, with $23.3 million as the latest value for Q4 2020.
- On a quarterly basis, Construction in Progress fell 11.99% to $23.3 million in Q4 2020 year-over-year; TTM through Dec 2020 was $23.3 million, a 11.99% decrease, with the full-year FY2020 number at $23.3 million, down 11.99% from a year prior.
- Construction in Progress was $23.3 million for Q4 2020 at Magnera, down from $26.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $137.7 million in Q4 2016 to a low of $21.9 million in Q4 2018.
- A 5-year average of $60.7 million and a median of $26.5 million in 2019 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: skyrocketed 134.69% in 2016, then crashed 76.69% in 2018.
- Magnera's Construction in Progress stood at $137.7 million in 2016, then crashed by 31.61% to $94.1 million in 2017, then plummeted by 76.69% to $21.9 million in 2018, then rose by 20.79% to $26.5 million in 2019, then dropped by 11.99% to $23.3 million in 2020.
- Per Business Quant, the three most recent readings for MAGN's Construction in Progress are $23.3 million (Q4 2020), $26.5 million (Q4 2019), and $21.9 million (Q4 2018).