Lee Enterprises (LEE) Construction in Progress (2016 - 2025)
Lee Enterprises' Construction in Progress history spans 16 years, with the latest figure at $2.3 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 67.22% year-over-year to $2.3 million; the TTM value through Dec 2025 reached $2.3 million, down 67.22%, while the annual FY2025 figure was $5.5 million, 1.69% down from the prior year.
- Construction in Progress reached $2.3 million in Q4 2025 per LEE's latest filing, down from $5.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $9.1 million in Q2 2025 to a low of $1.4 million in Q4 2023.
- Average Construction in Progress over 5 years is $4.2 million, with a median of $3.8 million recorded in 2021.
- Peak YoY movement for Construction in Progress: soared 423.76% in 2024, then crashed 67.22% in 2025.
- A 5-year view of Construction in Progress shows it stood at $4.4 million in 2021, then plummeted by 51.98% to $2.1 million in 2022, then plummeted by 35.99% to $1.4 million in 2023, then skyrocketed by 423.76% to $7.2 million in 2024, then plummeted by 67.22% to $2.3 million in 2025.
- Per Business Quant, the three most recent readings for LEE's Construction in Progress are $2.3 million (Q4 2025), $5.5 million (Q3 2025), and $9.1 million (Q2 2025).