Growth Metrics

Lear (LEA) Construction in Progress (2016 - 2022)

Historic Construction in Progress for Lear (LEA) over the last 13 years, with Q2 2022 value amounting to $349.2 million.

  • Lear's Construction in Progress rose 1385.72% to $349.2 million in Q2 2022 from the same period last year, while for Apr 2022 it was $349.2 million, marking a year-over-year increase of 1385.72%. This contributed to the annual value of $345.6 million for FY2021, which is 1108.97% up from last year.
  • According to the latest figures from Q2 2022, Lear's Construction in Progress is $349.2 million, which was up 1385.72% from $345.6 million recorded in Q4 2021.
  • Lear's 5-year Construction in Progress high stood at $426.2 million for Q3 2018, and its period low was $271.5 million during Q4 2020.
  • Over the past 5 years, Lear's median Construction in Progress value was $349.3 million (recorded in 2019), while the average stood at $352.3 million.
  • As far as peak fluctuations go, Lear's Construction in Progress tumbled by 2618.27% in 2020, and later surged by 2931.86% in 2021.
  • Over the past 5 years, Lear's Construction in Progress (Quarter) stood at $389.3 million in 2018, then fell by 1.77% to $382.4 million in 2019, then dropped by 18.65% to $311.1 million in 2020, then rose by 11.09% to $345.6 million in 2021, then grew by 1.04% to $349.2 million in 2022.
  • Its Construction in Progress was $349.2 million in Q2 2022, compared to $345.6 million in Q4 2021 and $351.1 million in Q4 2021.