Loews (L) Construction in Progress (2016 - 2025)
Loews' Construction in Progress history spans 17 years, with the latest figure at $357.0 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 44.53% year-over-year to $357.0 million; the TTM value through Dec 2025 reached $357.0 million, up 44.53%, while the annual FY2025 figure was $357.0 million, 44.53% up from the prior year.
- Construction in Progress reached $357.0 million in Q4 2025 per L's latest filing, up from $247.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $764.0 million in Q4 2023 to a low of $247.0 million in Q4 2024.
- Average Construction in Progress over 5 years is $444.2 million, with a median of $357.0 million recorded in 2025.
- Peak YoY movement for Construction in Progress: surged 50.88% in 2022, then crashed 67.67% in 2024.
- A 5-year view of Construction in Progress shows it stood at $340.0 million in 2021, then soared by 50.88% to $513.0 million in 2022, then surged by 48.93% to $764.0 million in 2023, then plummeted by 67.67% to $247.0 million in 2024, then surged by 44.53% to $357.0 million in 2025.
- Per Business Quant, the three most recent readings for L's Construction in Progress are $357.0 million (Q4 2025), $247.0 million (Q4 2024), and $764.0 million (Q4 2023).