Loews (L) Construction in Progress (2016 - 2025)
Loews filings provide 17 years of Construction in Progress readings, the most recent being $357.0 million for Q4 2025.
- On a quarterly basis, Construction in Progress rose 44.53% to $357.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $357.0 million, a 44.53% increase, with the full-year FY2025 number at $357.0 million, up 44.53% from a year prior.
- Construction in Progress hit $357.0 million in Q4 2025 for Loews, up from $247.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $764.0 million in Q4 2023 to a low of $247.0 million in Q4 2024.
- Median Construction in Progress over the past 5 years was $357.0 million (2025), compared with a mean of $444.2 million.
- Biggest five-year swings in Construction in Progress: soared 50.88% in 2022 and later plummeted 67.67% in 2024.
- Loews' Construction in Progress stood at $340.0 million in 2021, then soared by 50.88% to $513.0 million in 2022, then surged by 48.93% to $764.0 million in 2023, then plummeted by 67.67% to $247.0 million in 2024, then surged by 44.53% to $357.0 million in 2025.
- The last three reported values for Construction in Progress were $357.0 million (Q4 2025), $247.0 million (Q4 2024), and $764.0 million (Q4 2023) per Business Quant data.