Quaker Chemical (KWR) Construction in Progress (2016 - 2025)
Quaker Chemical (KWR) has disclosed Construction in Progress for 15 consecutive years, with $69.0 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 92.12% to $69.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $69.0 million, a 92.12% increase, with the full-year FY2025 number at $69.0 million, up 92.12% from a year prior.
- Construction in Progress was $69.0 million for Q4 2025 at Quaker Chemical, up from $35.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $69.0 million in Q4 2025 to a low of $16.2 million in Q4 2023.
- A 5-year average of $31.6 million and a median of $20.3 million in 2022 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: fell 20.41% in 2023, then surged 122.06% in 2024.
- Quaker Chemical's Construction in Progress stood at $16.5 million in 2021, then grew by 23.48% to $20.3 million in 2022, then dropped by 20.41% to $16.2 million in 2023, then soared by 122.06% to $35.9 million in 2024, then surged by 92.12% to $69.0 million in 2025.
- Per Business Quant, the three most recent readings for KWR's Construction in Progress are $69.0 million (Q4 2025), $35.9 million (Q4 2024), and $16.2 million (Q4 2023).