Growth Metrics

Quaker Chemical (KWR) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Quaker Chemical (KWR) over the last 14 years, with Q4 2024 value amounting to $35.9 million.

  • Quaker Chemical's Construction in Progress rose 12206.49% to $35.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $35.9 million, marking a year-over-year increase of 12206.49%. This contributed to the annual value of $35.9 million for FY2024, which is 12206.49% up from last year.
  • According to the latest figures from Q4 2024, Quaker Chemical's Construction in Progress is $35.9 million, which was up 12206.49% from $16.2 million recorded in Q4 2023.
  • Over the past 5 years, Quaker Chemical's Construction in Progress peaked at $35.9 million during Q4 2024, and registered a low of $8.4 million during Q4 2020.
  • Moreover, its 5-year median value for Construction in Progress was $16.5 million (2021), whereas its average is $19.5 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 2041.43% in 2023, then surged by 12206.49% in 2024.
  • Quarter analysis of 5 years shows Quaker Chemical's Construction in Progress stood at $8.4 million in 2020, then soared by 95.78% to $16.5 million in 2021, then grew by 23.48% to $20.3 million in 2022, then decreased by 20.41% to $16.2 million in 2023, then skyrocketed by 122.06% to $35.9 million in 2024.
  • Its Construction in Progress was $35.9 million in Q4 2024, compared to $16.2 million in Q4 2023 and $20.3 million in Q4 2022.