Kennedy-Wilson Holdings (KW) Construction in Progress (2017 - 2019)
Historic Construction in Progress for Kennedy-Wilson Holdings (KW) over the last 3 years, with Q4 2019 value amounting to $3.3 million.
- Kennedy-Wilson Holdings' Construction in Progress fell 5000.0% to $3.3 million in Q4 2019 from the same period last year, while for Dec 2019 it was $3.3 million, marking a year-over-year decrease of 5000.0%. This contributed to the annual value of $3.3 million for FY2019, which is 5000.0% down from last year.
- Per Kennedy-Wilson Holdings' latest filing, its Construction in Progress stood at $3.3 million for Q4 2019, which was down 5000.0% from $3.3 million recorded in Q3 2019.
- In the past 5 years, Kennedy-Wilson Holdings' Construction in Progress registered a high of $55.3 million during Q4 2017, and its lowest value of $3.3 million during Q3 2019.
- For the 3-year period, Kennedy-Wilson Holdings' Construction in Progress averaged around $23.8 million, with its median value being $27.5 million (2018).
- As far as peak fluctuations go, Kennedy-Wilson Holdings' Construction in Progress skyrocketed by 234.6% in 2018, and later tumbled by 9197.08% in 2019.
- Quarter analysis of 3 years shows Kennedy-Wilson Holdings' Construction in Progress stood at $55.3 million in 2017, then plummeted by 88.07% to $6.6 million in 2018, then tumbled by 50.0% to $3.3 million in 2019.
- Its Construction in Progress was $3.3 million in Q4 2019, compared to $3.3 million in Q3 2019 and $3.4 million in Q2 2019.