Growth Metrics

Frp Holdings (FRPH) Construction in Progress (2016 - 2025)

Frp Holdings filings provide 16 years of Construction in Progress readings, the most recent being $45.0 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 37.42% to $45.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $45.0 million, a 37.42% increase, with the full-year FY2025 number at $45.0 million, up 37.42% from a year prior.
  • Construction in Progress hit $45.0 million in Q4 2025 for Frp Holdings, up from $29.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $45.0 million in Q4 2025 to a low of $2.7 million in Q1 2023.
  • Median Construction in Progress over the past 5 years was $13.3 million (2022), compared with a mean of $17.3 million.
  • Biggest five-year swings in Construction in Progress: soared 1181.31% in 2021 and later crashed 76.08% in 2023.
  • Frp Holdings' Construction in Progress stood at $8.7 million in 2021, then soared by 40.84% to $12.2 million in 2022, then decreased by 11.16% to $10.8 million in 2023, then soared by 202.17% to $32.8 million in 2024, then surged by 37.42% to $45.0 million in 2025.
  • The last three reported values for Construction in Progress were $45.0 million (Q4 2025), $29.5 million (Q3 2025), and $16.2 million (Q2 2025) per Business Quant data.