Growth Metrics

Frp Holdings (FRPH) Construction in Progress (2016 - 2025)

Frp Holdings' Construction in Progress history spans 16 years, with the latest figure at $45.0 million for Q4 2025.

  • Quarterly results put Construction in Progress at $45.0 million for Q4 2025, up 37.42% from a year ago — trailing twelve months through Dec 2025 was $45.0 million (up 37.42% YoY), and the annual figure for FY2025 was $45.0 million, up 37.42%.
  • Construction in Progress for Q4 2025 was $45.0 million at Frp Holdings, up from $29.5 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $45.0 million in Q4 2025 to a low of $2.7 million in Q1 2023.
  • The 5-year median for Construction in Progress is $13.3 million (2022), against an average of $17.3 million.
  • The sharpest move saw Construction in Progress surged 1181.31% in 2021, then tumbled 76.08% in 2023.
  • Year by year, Construction in Progress stood at $8.7 million in 2021, then surged by 40.84% to $12.2 million in 2022, then dropped by 11.16% to $10.8 million in 2023, then surged by 202.17% to $32.8 million in 2024, then skyrocketed by 37.42% to $45.0 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $45.0 million, $29.5 million, and $16.2 million for Q4 2025, Q3 2025, and Q2 2025 respectively.