Growth Metrics

Karat Packaging (KRT) Construction in Progress (2024 - 2025)

Historic Construction in Progress for Karat Packaging (KRT) over the last 2 years, with Q3 2025 value amounting to $210000.0.

  • Karat Packaging's Construction in Progress changed N/A to $210000.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $210000.0, marking a year-over-year change of. This contributed to the annual value of $431000.0 for FY2024, which is N/A changed from last year.
  • As of Q3 2025, Karat Packaging's Construction in Progress stood at $210000.0.
  • Over the past 5 years, Karat Packaging's Construction in Progress peaked at $723000.0 during Q1 2025, and registered a low of $210000.0 during Q3 2025.