Growth Metrics

Karat Packaging (KRT) Construction in Progress (2024 - 2025)

Karat Packaging has reported Construction in Progress over the past 2 years, most recently at $210000.0 for Q3 2025.

  • Quarterly results put Construction in Progress at $210000.0 for Q3 2025, changed N/A from a year ago — trailing twelve months through Sep 2025 was $210000.0 (changed N/A YoY), and the annual figure for FY2024 was $431000.0, changed.
  • Construction in Progress for Q3 2025 was $210000.0 at Karat Packaging, down from $256000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for KRT hit a ceiling of $723000.0 in Q1 2025 and a floor of $210000.0 in Q3 2025.