Caseys General Stores (CASY) Construction in Progress (2017 - 2025)
Caseys General Stores' Construction in Progress history spans 9 years, with the latest figure at $131.2 million for Q2 2025.
- On a quarterly basis, Construction in Progress rose 20.27% to $131.2 million in Q2 2025 year-over-year; TTM through Apr 2025 was $131.2 million, a 20.27% increase, with the full-year FY2025 number at $131.2 million, up 20.27% from a year prior.
- Construction in Progress hit $131.2 million in Q2 2025 for Caseys General Stores, up from $109.0 million in the prior quarter.
- Over the last five years, Construction in Progress for CASY hit a ceiling of $169.8 million in Q2 2023 and a floor of $92.3 million in Q2 2022.
- Historically, Construction in Progress has averaged $120.2 million across 5 years, with a median of $109.0 million in 2024.
- Biggest five-year swings in Construction in Progress: surged 83.9% in 2023 and later plummeted 35.78% in 2024.
- Tracing CASY's Construction in Progress over 5 years: stood at $98.6 million in 2021, then decreased by 6.35% to $92.3 million in 2022, then soared by 83.9% to $169.8 million in 2023, then plummeted by 35.78% to $109.0 million in 2024, then increased by 20.27% to $131.2 million in 2025.
- Business Quant data shows Construction in Progress for CASY at $131.2 million in Q2 2025, $109.0 million in Q2 2024, and $169.8 million in Q2 2023.