Caseys General Stores (CASY) Construction in Progress (2017 - 2025)
Historic Construction in Progress for Caseys General Stores (CASY) over the last 9 years, with Q2 2025 value amounting to $131.2 million.
- Caseys General Stores' Construction in Progress rose 2026.91% to $131.2 million in Q2 2025 from the same period last year, while for Apr 2025 it was $131.2 million, marking a year-over-year increase of 2026.91%. This contributed to the annual value of $131.2 million for FY2025, which is 2026.91% up from last year.
- Latest data reveals that Caseys General Stores reported Construction in Progress of $131.2 million as of Q2 2025, which was up 2026.91% from $109.0 million recorded in Q2 2024.
- Over the past 5 years, Caseys General Stores' Construction in Progress peaked at $169.8 million during Q2 2023, and registered a low of $92.3 million during Q2 2022.
- Moreover, its 5-year median value for Construction in Progress was $109.0 million (2024), whereas its average is $120.2 million.
- As far as peak fluctuations go, Caseys General Stores' Construction in Progress surged by 8389.92% in 2023, and later tumbled by 3577.71% in 2024.
- Caseys General Stores' Construction in Progress (Quarter) stood at $98.6 million in 2021, then decreased by 6.35% to $92.3 million in 2022, then skyrocketed by 83.9% to $169.8 million in 2023, then plummeted by 35.78% to $109.0 million in 2024, then increased by 20.27% to $131.2 million in 2025.
- Its Construction in Progress stands at $131.2 million for Q2 2025, versus $109.0 million for Q2 2024 and $169.8 million for Q2 2023.