Kronos Worldwide (KRO) Construction in Progress (2016 - 2025)
Kronos Worldwide (KRO) has disclosed Construction in Progress for 16 consecutive years, with $44.5 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 8.27% to $44.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $44.5 million, a 8.27% increase, with the full-year FY2025 number at $44.5 million, up 8.27% from a year prior.
- Construction in Progress was $44.5 million for Q4 2025 at Kronos Worldwide, roughly flat from $44.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $85.5 million in Q2 2023 to a low of $22.1 million in Q1 2024.
- A 5-year average of $54.9 million and a median of $54.4 million in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: crashed 73.92% in 2024, then soared 105.88% in 2025.
- Kronos Worldwide's Construction in Progress stood at $72.7 million in 2021, then rose by 5.23% to $76.5 million in 2022, then crashed by 70.07% to $22.9 million in 2023, then surged by 79.48% to $41.1 million in 2024, then grew by 8.27% to $44.5 million in 2025.
- Per Business Quant, the three most recent readings for KRO's Construction in Progress are $44.5 million (Q4 2025), $44.5 million (Q3 2025), and $45.4 million (Q2 2025).