Growth Metrics

Kla (KLAC) Construction in Progress (2016 - 2025)

Kla's Construction in Progress history spans 16 years, with the latest figure at $210.6 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 17.68% year-over-year to $210.6 million; the TTM value through Dec 2025 reached $210.6 million, down 17.68%, while the annual FY2025 figure was $207.8 million, 3.35% down from the prior year.
  • Construction in Progress reached $210.6 million in Q4 2025 per KLAC's latest filing, up from $204.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $287.3 million in Q1 2025 to a low of $110.1 million in Q2 2022.
  • Average Construction in Progress over 5 years is $192.8 million, with a median of $193.8 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: soared 96.9% in 2021, then plummeted 39.62% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $236.5 million in 2021, then crashed by 32.55% to $159.6 million in 2022, then increased by 26.26% to $201.4 million in 2023, then grew by 27.01% to $255.9 million in 2024, then dropped by 17.68% to $210.6 million in 2025.
  • Per Business Quant, the three most recent readings for KLAC's Construction in Progress are $210.6 million (Q4 2025), $204.4 million (Q3 2025), and $207.8 million (Q2 2025).