Growth Metrics

Kla (KLAC) Construction in Progress: 2010-2025

Historic Construction in Progress for Kla (KLAC) over the last 16 years, with Q3 2025 value amounting to $204.4 million.

  • Kla's Construction in Progress fell 1518.79% to $204.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $204.4 million, marking a year-over-year decrease of 1518.79%. This contributed to the annual value of $207.8 million for FY2025, which is 334.83% down from last year.
  • Latest data reveals that Kla reported Construction in Progress of $204.4 million as of Q3 2025, which was down 1518.79% from $207.8 million recorded in Q2 2025.
  • Kla's 5-year Construction in Progress high stood at $287.3 million for Q1 2025, and its period low was $110.1 million during Q2 2022.
  • For the 5-year period, Kla's Construction in Progress averaged around $191.9 million, with its median value being $186.1 million (2024).
  • As far as peak fluctuations go, Kla's Construction in Progress skyrocketed by 9690.14% in 2021, and later tumbled by 3962.32% in 2022.
  • Kla's Construction in Progress (Quarter) stood at $236.5 million in 2021, then tumbled by 32.55% to $159.6 million in 2022, then increased by 26.26% to $201.4 million in 2023, then grew by 27.01% to $255.9 million in 2024, then decreased by 20.09% to $204.4 million in 2025.
  • Its Construction in Progress was $204.4 million in Q3 2025, compared to $207.8 million in Q2 2025 and $287.3 million in Q1 2025.