Growth Metrics

Joint (JYNT) Construction in Progress (2016 - 2025)

Joint (JYNT) has disclosed Construction in Progress for 11 consecutive years, with $990149.0 as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 31.69% to $990149.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $990149.0 through Dec 2025, up 31.69% year-over-year, with the annual reading at $990149.0 for FY2025, 31.69% up from the prior year.
  • Construction in Progress hit $990149.0 in Q4 2025 for Joint, up from $500475.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $5.5 million in Q2 2021 to a low of $500475.0 in Q3 2025.
  • Historically, Construction in Progress has averaged $1.3 million across 5 years, with a median of $1.0 million in 2023.
  • Biggest YoY gain for Construction in Progress was 99.86% in 2021; the steepest drop was 69.25% in 2021.
  • Year by year, Construction in Progress stood at $1.1 million in 2021, then increased by 0.39% to $1.1 million in 2022, then crashed by 45.93% to $597151.0 in 2023, then rose by 25.91% to $751873.0 in 2024, then surged by 31.69% to $990149.0 in 2025.
  • Business Quant data shows Construction in Progress for JYNT at $990149.0 in Q4 2025, $500475.0 in Q3 2025, and $568554.0 in Q2 2025.