Growth Metrics

Joint (JYNT) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Joint (JYNT) over the last 11 years, with Q3 2025 value amounting to $500475.0.

  • Joint's Construction in Progress fell 2809.4% to $500475.0 in Q3 2025 from the same period last year, while for Sep 2025 it was $500475.0, marking a year-over-year decrease of 2809.4%. This contributed to the annual value of $751873.0 for FY2024, which is 2591.0% up from last year.
  • Per Joint's latest filing, its Construction in Progress stood at $500475.0 for Q3 2025, which was down 2809.4% from $568554.0 recorded in Q2 2025.
  • Over the past 5 years, Joint's Construction in Progress peaked at $5.5 million during Q2 2021, and registered a low of $500475.0 during Q3 2025.
  • Its 5-year average for Construction in Progress is $1.4 million, with a median of $1.0 million in 2023.
  • Within the past 5 years, the most significant YoY rise in Joint's Construction in Progress was 9986.27% (2021), while the steepest drop was 6924.65% (2021).
  • Quarter analysis of 5 years shows Joint's Construction in Progress stood at $1.1 million in 2021, then increased by 0.39% to $1.1 million in 2022, then tumbled by 45.93% to $597151.0 in 2023, then increased by 25.91% to $751873.0 in 2024, then crashed by 33.44% to $500475.0 in 2025.
  • Its Construction in Progress stands at $500475.0 for Q3 2025, versus $568554.0 for Q2 2025 and $624494.0 for Q1 2025.