InvenTrust Properties (IVT) Construction in Progress (2016 - 2025)
InvenTrust Properties' Construction in Progress history spans 16 years, with the latest figure at $7.5 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 24.9% year-over-year to $7.5 million; the TTM value through Dec 2025 reached $7.5 million, down 24.9%, while the annual FY2025 figure was $7.5 million, 24.9% down from the prior year.
- Construction in Progress reached $7.5 million in Q4 2025 per IVT's latest filing, down from $10.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $16.9 million in Q2 2022 to a low of $4.2 million in Q1 2021.
- Average Construction in Progress over 5 years is $8.1 million, with a median of $7.1 million recorded in 2023.
- The largest YoY upside for Construction in Progress was 260.04% in 2022 against a maximum downside of 48.09% in 2022.
- A 5-year view of Construction in Progress shows it stood at $9.6 million in 2021, then plummeted by 48.09% to $5.0 million in 2022, then grew by 17.66% to $5.9 million in 2023, then surged by 68.98% to $10.0 million in 2024, then decreased by 24.9% to $7.5 million in 2025.
- Per Business Quant, the three most recent readings for IVT's Construction in Progress are $7.5 million (Q4 2025), $10.5 million (Q3 2025), and $6.5 million (Q2 2025).