Growth Metrics

Ispire Technology (ISPR) Construction in Progress (2023 - 2025)

Ispire Technology (ISPR) has disclosed Construction in Progress for 3 consecutive years, with $911914.0 as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 4890.23% to $911914.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $911914.0 through Dec 2025, up 4890.23% year-over-year, with the annual reading at $894919.0 for FY2025, 2352.98% up from the prior year.
  • Construction in Progress for Q4 2025 was $911914.0 at Ispire Technology, up from $898087.0 in the prior quarter.
  • The five-year high for Construction in Progress was $911914.0 in Q4 2025, with the low at $18274.0 in Q4 2024.
  • Average Construction in Progress over 3 years is $378244.6, with a median of $287824.0 recorded in 2024.
  • The sharpest move saw Construction in Progress tumbled 93.84% in 2024, then skyrocketed 4890.23% in 2025.
  • Over 3 years, Construction in Progress stood at $296557.0 in 2023, then crashed by 93.84% to $18274.0 in 2024, then surged by 4890.23% to $911914.0 in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $911914.0, $898087.0, and $894919.0 for Q4 2025, Q3 2025, and Q2 2025 respectively.