Growth Metrics

Ispire Technology (ISPR) Construction in Progress (2023 - 2026)

Ispire Technology has reported Construction in Progress over the past 3 years, most recently at $911914.0 for Q4 2025.

  • Quarterly Construction in Progress rose 4890.23% to $911914.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $911914.0 through Dec 2025, up 4890.23% year-over-year, with the annual reading at $894919.0 for FY2025, 2352.98% up from the prior year.
  • Construction in Progress was $911914.0 for Q4 2025 at Ispire Technology, up from $898087.0 in the prior quarter.
  • Over five years, Construction in Progress peaked at $911914.0 in Q4 2025 and troughed at $18274.0 in Q4 2024.
  • The 3-year median for Construction in Progress is $287824.0 (2024), against an average of $378244.6.
  • Year-over-year, Construction in Progress plummeted 93.84% in 2024 and then soared 4890.23% in 2025.
  • A 3-year view of Construction in Progress shows it stood at $296557.0 in 2023, then plummeted by 93.84% to $18274.0 in 2024, then soared by 4890.23% to $911914.0 in 2025.
  • Per Business Quant, the three most recent readings for ISPR's Construction in Progress are $911914.0 (Q4 2025), $898087.0 (Q3 2025), and $894919.0 (Q2 2025).