Ispire Technology (ISPR) Construction in Progress (2023 - 2025)
Historic Construction in Progress for Ispire Technology (ISPR) over the last 3 years, with Q4 2025 value amounting to $911914.0.
- Ispire Technology's Construction in Progress rose 489022.66% to $911914.0 in Q4 2025 from the same period last year, while for Dec 2025 it was $911914.0, marking a year-over-year increase of 489022.66%. This contributed to the annual value of $894919.0 for FY2025, which is 235297.54% up from last year.
- Per Ispire Technology's latest filing, its Construction in Progress stood at $911914.0 for Q4 2025, which was up 489022.66% from $898087.0 recorded in Q3 2025.
- Ispire Technology's Construction in Progress' 5-year high stood at $911914.0 during Q4 2025, with a 5-year trough of $18274.0 in Q4 2024.
- In the last 3 years, Ispire Technology's Construction in Progress had a median value of $287824.0 in 2024 and averaged $378244.6.
- Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 9383.79% in 2024, then soared by 489022.66% in 2025.
- Quarter analysis of 3 years shows Ispire Technology's Construction in Progress stood at $296557.0 in 2023, then plummeted by 93.84% to $18274.0 in 2024, then skyrocketed by 4890.23% to $911914.0 in 2025.
- Its Construction in Progress stands at $911914.0 for Q4 2025, versus $898087.0 for Q3 2025 and $894919.0 for Q2 2025.