Ispire Technology (ISPR) Construction in Progress (2023 - 2025)
Ispire Technology (ISPR) has disclosed Construction in Progress for 3 consecutive years, with $911914.0 as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 4890.23% to $911914.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $911914.0, a 4890.23% increase, with the full-year FY2025 number at $894919.0, up 2352.98% from a year prior.
- Construction in Progress was $911914.0 for Q4 2025 at Ispire Technology, up from $898087.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $911914.0 in Q4 2025 to a low of $18274.0 in Q4 2024.
- A 3-year average of $378244.6 and a median of $287824.0 in 2024 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: plummeted 93.84% in 2024, then soared 4890.23% in 2025.
- Ispire Technology's Construction in Progress stood at $296557.0 in 2023, then tumbled by 93.84% to $18274.0 in 2024, then skyrocketed by 4890.23% to $911914.0 in 2025.
- Per Business Quant, the three most recent readings for ISPR's Construction in Progress are $911914.0 (Q4 2025), $898087.0 (Q3 2025), and $894919.0 (Q2 2025).