Growth Metrics

Incyte (INCY) Construction in Progress: 2019-2022

Historic Construction in Progress for Incyte (INCY) over the last 3 years, with Dec 2022 value amounting to $176.2 million.

  • Incyte's Construction in Progress fell 10.74% to $176.2 million in Q4 2022 from the same period last year, while for Dec 2022 it was $176.2 million, marking a year-over-year decrease of 10.74%. This contributed to the annual value of $176.2 million for FY2022, which is 10.74% down from last year.
  • As of Q4 2022, Incyte's Construction in Progress stood at $176.2 million, which was down 10.74% from $197.4 million recorded in Q4 2021.
  • Over the past 5 years, Incyte's Construction in Progress peaked at $197.4 million during Q4 2021, and registered a low of $2.0 million during Q1 2019.
  • For the 3-year period, Incyte's Construction in Progress averaged around $99.0 million, with its median value being $125.6 million (2021).
  • Its Construction in Progress has fluctuated over the past 5 years, first spiked by 1,113.04% in 2020, then dropped by 10.74% in 2022.
  • Incyte's Construction in Progress (Quarterly) stood at $13.8 million in 2019, then skyrocketed by 1,113.04% to $167.4 million in 2020, then rose by 17.92% to $197.4 million in 2021, then decreased by 10.74% to $176.2 million in 2022.
  • Its last three reported values are $176.2 million in Q4 2022, $197.4 million for Q4 2021, and $140.7 million during Q3 2021.