Growth Metrics

Incyte (INCY) Construction in Progress (2019 - 2022)

Incyte's Construction in Progress history spans 4 years, with the latest figure at $176.2 million for Q4 2022.

  • For Q4 2022, Construction in Progress fell 10.74% year-over-year to $176.2 million; the TTM value through Dec 2022 reached $176.2 million, down 10.74%, while the annual FY2022 figure was $176.2 million, 10.74% down from the prior year.
  • Construction in Progress reached $176.2 million in Q4 2022 per INCY's latest filing, down from $197.4 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $197.4 million in Q4 2021 to a low of $2.0 million in Q1 2019.
  • Average Construction in Progress over 4 years is $75.9 million, with a median of $23.1 million recorded in 2020.
  • Peak YoY movement for Construction in Progress: surged 1113.04% in 2020, then dropped 10.74% in 2022.
  • A 4-year view of Construction in Progress shows it stood at $13.8 million in 2019, then soared by 1113.04% to $167.4 million in 2020, then increased by 17.92% to $197.4 million in 2021, then decreased by 10.74% to $176.2 million in 2022.
  • Per Business Quant, the three most recent readings for INCY's Construction in Progress are $176.2 million (Q4 2022), $197.4 million (Q4 2021), and $140.7 million (Q3 2021).