Innovative Industrial Properties (IIPR) Construction in Progress (2018 - 2025)
Innovative Industrial Properties' Construction in Progress history spans 7 years, with the latest figure at $40.6 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 34.94% year-over-year to $40.6 million; the TTM value through Dec 2025 reached $40.6 million, down 34.94%, while the annual FY2025 figure was $40.6 million, 34.94% down from the prior year.
- Construction in Progress for Q4 2025 was $40.6 million at Innovative Industrial Properties, down from $57.7 million in the prior quarter.
- Across five years, Construction in Progress topped out at $123.9 million in Q1 2024 and bottomed at $2.4 million in Q1 2021.
- The 5-year median for Construction in Progress is $60.5 million (2022), against an average of $67.0 million.
- The largest annual shift saw Construction in Progress skyrocketed 1696.84% in 2022 before it plummeted 51.18% in 2025.
- A 5-year view of Construction in Progress shows it stood at $4.6 million in 2021, then surged by 1081.1% to $54.1 million in 2022, then skyrocketed by 117.67% to $117.8 million in 2023, then plummeted by 47.02% to $62.4 million in 2024, then tumbled by 34.94% to $40.6 million in 2025.
- Per Business Quant, the three most recent readings for IIPR's Construction in Progress are $40.6 million (Q4 2025), $57.7 million (Q3 2025), and $57.5 million (Q2 2025).