Hudson Pacific Properties (HPP) Construction in Progress (2016 - 2018)
Hudson Pacific Properties' Construction in Progress history spans 9 years, with the latest figure at $286.4 million for Q1 2018.
- For Q1 2018, Construction in Progress rose 32.27% year-over-year to $286.4 million; the TTM value through Mar 2018 reached $286.4 million, up 32.27%, while the annual FY2017 figure was $219.2 million, 25.75% down from the prior year.
- Construction in Progress for Q1 2018 was $286.4 million at Hudson Pacific Properties, up from $219.2 million in the prior quarter.
- Across five years, Construction in Progress topped out at $295.2 million in Q4 2016 and bottomed at $78.0 million in Q1 2014.
- The 5-year median for Construction in Progress is $189.2 million (2015), against an average of $186.8 million.
- The largest annual shift saw Construction in Progress soared 166.42% in 2014 before it dropped 25.75% in 2017.
- A 5-year view of Construction in Progress shows it stood at $135.8 million in 2014, then increased by 27.35% to $173.0 million in 2015, then soared by 70.65% to $295.2 million in 2016, then dropped by 25.75% to $219.2 million in 2017, then skyrocketed by 30.63% to $286.4 million in 2018.
- Per Business Quant, the three most recent readings for HPP's Construction in Progress are $286.4 million (Q1 2018), $219.2 million (Q4 2017), and $247.6 million (Q2 2017).