Hudson Pacific Properties (HPP) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Hudson Pacific Properties (HPP) over the last 10 years, with Q2 2018 value amounting to $303.3 million.
- Hudson Pacific Properties' Construction in Progress rose 2246.34% to $303.3 million in Q2 2018 from the same period last year, while for Jun 2018 it was $303.3 million, marking a year-over-year increase of 2246.34%. This contributed to the annual value of $219.2 million for FY2017, which is 2574.47% down from last year.
- As of Q2 2018, Hudson Pacific Properties' Construction in Progress stood at $303.3 million, which was up 2246.34% from $219.2 million recorded in Q4 2017.
- In the past 5 years, Hudson Pacific Properties' Construction in Progress registered a high of $303.3 million during Q2 2018, and its lowest value of $78.0 million during Q1 2014.
- Over the past 5 years, Hudson Pacific Properties' median Construction in Progress value was $203.4 million (recorded in 2016), while the average stood at $192.4 million.
- In the last 5 years, Hudson Pacific Properties' Construction in Progress surged by 16641.79% in 2014 and then tumbled by 2574.47% in 2017.
- Hudson Pacific Properties' Construction in Progress (Quarter) stood at $135.8 million in 2014, then increased by 27.35% to $173.0 million in 2015, then skyrocketed by 70.65% to $295.2 million in 2016, then fell by 25.74% to $219.2 million in 2017, then soared by 38.33% to $303.3 million in 2018.
- Its Construction in Progress was $303.3 million in Q2 2018, compared to $219.2 million in Q4 2017 and $265.7 million in Q3 2017.