Hallador Energy (HNRG) Construction in Progress (2016 - 2025)
Hallador Energy (HNRG) has disclosed Construction in Progress for 16 consecutive years, with $39.7 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 45.81% to $39.7 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $39.7 million through Dec 2025, up 45.81% year-over-year, with the annual reading at $39.7 million for FY2025, 45.81% up from the prior year.
- Construction in Progress hit $39.7 million in Q4 2025 for Hallador Energy, down from $99.9 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $167.1 million in Q3 2024 to a low of $27.2 million in Q4 2024.
- Historically, Construction in Progress has averaged $119.3 million across 5 years, with a median of $119.7 million in 2022.
- Biggest five-year swings in Construction in Progress: crashed 82.85% in 2024 and later soared 45.81% in 2025.
- Year by year, Construction in Progress stood at $112.6 million in 2021, then grew by 24.46% to $140.1 million in 2022, then rose by 13.23% to $158.6 million in 2023, then plummeted by 82.85% to $27.2 million in 2024, then soared by 45.81% to $39.7 million in 2025.
- Business Quant data shows Construction in Progress for HNRG at $39.7 million in Q4 2025, $99.9 million in Q3 2025, and $96.8 million in Q2 2025.