Vistra (VST) Construction in Progress (2017 - 2025)

Vistra has reported Construction in Progress over the past 9 years, most recently at $1.9 billion for Q4 2025.

  • Quarterly results put Construction in Progress at $1.9 billion for Q4 2025, up 80.85% from a year ago — trailing twelve months through Dec 2025 was $1.9 billion (up 80.85% YoY), and the annual figure for FY2025 was $1.9 billion, up 80.85%.
  • Construction in Progress for Q4 2025 was $1.9 billion at Vistra, down from $2.0 billion in the prior quarter.
  • Over the last five years, Construction in Progress for VST hit a ceiling of $2.0 billion in Q3 2025 and a floor of $264.0 million in Q3 2022.
  • Median Construction in Progress over the past 5 years was $631.0 million (2022), compared with a mean of $825.2 million.
  • Biggest five-year swings in Construction in Progress: tumbled 39.31% in 2022 and later surged 219.6% in 2024.
  • Vistra's Construction in Progress stood at $486.0 million in 2021, then increased by 7.41% to $522.0 million in 2022, then changed by 0.0% to $522.0 million in 2023, then soared by 103.07% to $1.1 billion in 2024, then skyrocketed by 80.85% to $1.9 billion in 2025.
  • The last three reported values for Construction in Progress were $1.9 billion (Q4 2025), $2.0 billion (Q3 2025), and $1.6 billion (Q2 2025) per Business Quant data.