Gulf Resources (GURE) Construction in Progress (2016 - 2025)
Gulf Resources' Construction in Progress history spans 13 years, with the latest figure at $47.6 million for Q2 2025.
- On a quarterly basis, Construction in Progress rose 364.22% to $47.6 million in Q2 2025 year-over-year; TTM through Jun 2025 was $47.6 million, a 364.22% increase, with the full-year FY2024 number at $10.2 million, down 1.47% from a year prior.
- Construction in Progress hit $47.6 million in Q2 2025 for Gulf Resources, up from $10.2 million in the prior quarter.
- Over the last five years, Construction in Progress for GURE hit a ceiling of $68.6 million in Q1 2022 and a floor of $10.1 million in Q2 2023.
- Historically, Construction in Progress has averaged $21.7 million across 5 years, with a median of $14.7 million in 2021.
- Biggest five-year swings in Construction in Progress: tumbled 84.51% in 2023 and later skyrocketed 364.22% in 2025.
- Tracing GURE's Construction in Progress over 5 years: stood at $44.3 million in 2021, then tumbled by 74.37% to $11.4 million in 2022, then dropped by 9.24% to $10.3 million in 2023, then dropped by 1.47% to $10.2 million in 2024, then surged by 368.26% to $47.6 million in 2025.
- Business Quant data shows Construction in Progress for GURE at $47.6 million in Q2 2025, $10.2 million in Q1 2025, and $10.2 million in Q4 2024.