Growth Metrics

Globalstar (GSAT) Construction in Progress (2020 - 2023)

Historic Construction in Progress for Globalstar (GSAT) over the last 3 years, with Q3 2023 value amounting to $182.5 million.

  • Globalstar's Construction in Progress rose 22358.16% to $182.5 million in Q3 2023 from the same period last year, while for Sep 2023 it was $182.5 million, marking a year-over-year increase of 22358.16%. This contributed to the annual value of $98.5 million for FY2022, which is N/A changed from last year.
  • Per Globalstar's latest filing, its Construction in Progress stood at $182.5 million for Q3 2023, which was up 22358.16% from $166.0 million recorded in Q2 2023.
  • Globalstar's 5-year Construction in Progress high stood at $182.5 million for Q3 2023, and its period low was $7.9 million during Q4 2020.
  • Its 3-year average for Construction in Progress is $86.4 million, with a median of $77.4 million in 2022.
  • Within the past 5 years, the most significant YoY rise in Globalstar's Construction in Progress was 61354.84% (2023), while the steepest drop was 20627.31% (2023).
  • Over the past 3 years, Globalstar's Construction in Progress (Quarter) stood at $7.9 million in 2020, then skyrocketed by 1146.84% to $98.5 million in 2022, then surged by 85.28% to $182.5 million in 2023.
  • Its Construction in Progress was $182.5 million in Q3 2023, compared to $166.0 million in Q2 2023 and $110.6 million in Q1 2023.