Chunghwa Telecom (CHT) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Chunghwa Telecom (CHT) over the last 9 years, with Q4 2024 value amounting to $4.9 million.
- Chunghwa Telecom's Construction in Progress rose 3501.99% to $4.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $4.9 million, marking a year-over-year increase of 3501.99%. This contributed to the annual value of $4.9 million for FY2024, which is 3501.99% up from last year.
- Per Chunghwa Telecom's latest filing, its Construction in Progress stood at $4.9 million for Q4 2024, which was up 3501.99% from $3.6 million recorded in Q4 2023.
- Chunghwa Telecom's 5-year Construction in Progress high stood at $4.9 million for Q4 2024, and its period low was $2.7 million during Q4 2020.
- Moreover, its 5-year median value for Construction in Progress was $3.3 million (2022), whereas its average is $3.5 million.
- As far as peak fluctuations go, Chunghwa Telecom's Construction in Progress soared by 693.7% in 2020, and later soared by 3501.99% in 2024.
- Chunghwa Telecom's Construction in Progress (Quarter) stood at $2.7 million in 2020, then rose by 11.75% to $3.0 million in 2021, then rose by 8.8% to $3.3 million in 2022, then rose by 10.94% to $3.6 million in 2023, then skyrocketed by 35.02% to $4.9 million in 2024.
- Its Construction in Progress stands at $4.9 million for Q4 2024, versus $3.6 million for Q4 2023 and $3.3 million for Q4 2022.