Chunghwa Telecom (CHT) Construction in Progress (2016 - 2025)
Chunghwa Telecom has reported Construction in Progress over the past 10 years, most recently at $10.6 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 116.11% year-over-year to $10.6 million; the TTM value through Dec 2025 reached $10.6 million, up 116.11%, while the annual FY2025 figure was $10.6 million, 116.11% up from the prior year.
- Construction in Progress for Q4 2025 was $10.6 million at Chunghwa Telecom, up from $4.9 million in the prior quarter.
- Over five years, Construction in Progress peaked at $10.6 million in Q4 2025 and troughed at $3.0 million in Q4 2021.
- A 5-year average of $5.1 million and a median of $3.6 million in 2023 define the central range for Construction in Progress.
- Biggest five-year swings in Construction in Progress: rose 8.8% in 2022 and later skyrocketed 116.11% in 2025.
- Year by year, Construction in Progress stood at $3.0 million in 2021, then rose by 8.8% to $3.3 million in 2022, then grew by 10.94% to $3.6 million in 2023, then soared by 35.02% to $4.9 million in 2024, then skyrocketed by 116.11% to $10.6 million in 2025.
- Business Quant data shows Construction in Progress for CHT at $10.6 million in Q4 2025, $4.9 million in Q4 2024, and $3.6 million in Q4 2023.