Chunghwa Telecom (CHT) Construction in Progress (2016 - 2025)

Chunghwa Telecom's Construction in Progress history spans 10 years, with the latest figure at $10.6 million for Q4 2025.

  • Quarterly results put Construction in Progress at $10.6 million for Q4 2025, up 116.11% from a year ago — trailing twelve months through Dec 2025 was $10.6 million (up 116.11% YoY), and the annual figure for FY2025 was $10.6 million, up 116.11%.
  • Construction in Progress for Q4 2025 was $10.6 million at Chunghwa Telecom, up from $4.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $10.6 million in Q4 2025 to a low of $3.0 million in Q4 2021.
  • The 5-year median for Construction in Progress is $3.6 million (2023), against an average of $5.1 million.
  • The sharpest move saw Construction in Progress grew 8.8% in 2022, then surged 116.11% in 2025.
  • Year by year, Construction in Progress stood at $3.0 million in 2021, then increased by 8.8% to $3.3 million in 2022, then increased by 10.94% to $3.6 million in 2023, then surged by 35.02% to $4.9 million in 2024, then surged by 116.11% to $10.6 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $10.6 million, $4.9 million, and $3.6 million for Q4 2025, Q4 2024, and Q4 2023 respectively.