KPIs & Operating Metrics(New)
Growth Metrics

Verizon Communications (VZ) Construction in Progress (2016 - 2025)

Verizon Communications (VZ) has disclosed Construction in Progress for 17 consecutive years, with $7.0 billion as the latest value for Q4 2025.

  • Quarterly Construction in Progress fell 30.69% to $7.0 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $7.0 billion through Dec 2025, down 30.69% year-over-year, with the annual reading at $7.0 billion for FY2025, 30.69% down from the prior year.
  • Construction in Progress for Q4 2025 was $7.0 billion at Verizon Communications, down from $7.9 billion in the prior quarter.
  • The five-year high for Construction in Progress was $54.9 billion in Q4 2021, with the low at $7.0 billion in Q4 2025.
  • Average Construction in Progress over 5 years is $30.0 billion, with a median of $30.3 billion recorded in 2023.
  • The sharpest move saw Construction in Progress skyrocketed 1428.57% in 2021, then plummeted 69.27% in 2024.
  • Over 5 years, Construction in Progress stood at $54.9 billion in 2021, then decreased by 24.04% to $41.7 billion in 2022, then plummeted by 64.03% to $15.0 billion in 2023, then tumbled by 32.67% to $10.1 billion in 2024, then crashed by 30.69% to $7.0 billion in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $7.0 billion, $7.9 billion, and $8.6 billion for Q4 2025, Q3 2025, and Q2 2025 respectively.