KPIs & Operating Metrics(New)
Growth Metrics

Verizon Communications (VZ) Construction in Progress (2016 - 2026)

Verizon Communications has reported Construction in Progress over the past 18 years, most recently at $6.3 billion for Q1 2026.

  • Quarterly Construction in Progress fell 32.98% to $6.3 billion in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $6.3 billion through Mar 2026, down 32.98% year-over-year, with the annual reading at $7.0 billion for FY2025, 30.69% down from the prior year.
  • Construction in Progress was $6.3 billion for Q1 2026 at Verizon Communications, down from $7.0 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $53.2 billion in Q1 2022 and troughed at $6.3 billion in Q1 2026.
  • The 5-year median for Construction in Progress is $13.9 billion (2024), against an average of $22.9 billion.
  • Year-over-year, Construction in Progress dropped 0.56% in 2022 and then crashed 69.27% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $41.7 billion in 2022, then tumbled by 64.03% to $15.0 billion in 2023, then crashed by 32.67% to $10.1 billion in 2024, then plummeted by 30.69% to $7.0 billion in 2025, then dropped by 10.0% to $6.3 billion in 2026.
  • Per Business Quant, the three most recent readings for VZ's Construction in Progress are $6.3 billion (Q1 2026), $7.0 billion (Q4 2025), and $7.9 billion (Q3 2025).