Verizon Communications (VZ) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Verizon Communications (VZ) over the last 17 years, with Q4 2025 value amounting to $7.0 billion.
- Verizon Communications' Construction in Progress fell 3069.31% to $7.0 billion in Q4 2025 from the same period last year, while for Dec 2025 it was $7.0 billion, marking a year-over-year decrease of 3069.31%. This contributed to the annual value of $7.0 billion for FY2025, which is 3069.31% down from last year.
- Latest data reveals that Verizon Communications reported Construction in Progress of $7.0 billion as of Q4 2025, which was down 3069.31% from $7.9 billion recorded in Q3 2025.
- Verizon Communications' 5-year Construction in Progress high stood at $54.9 billion for Q4 2021, and its period low was $7.0 billion during Q4 2025.
- Its 5-year average for Construction in Progress is $30.0 billion, with a median of $30.3 billion in 2023.
- As far as peak fluctuations go, Verizon Communications' Construction in Progress skyrocketed by 142857.14% in 2021, and later crashed by 6927.08% in 2024.
- Verizon Communications' Construction in Progress (Quarter) stood at $54.9 billion in 2021, then fell by 24.04% to $41.7 billion in 2022, then crashed by 64.03% to $15.0 billion in 2023, then plummeted by 32.67% to $10.1 billion in 2024, then tumbled by 30.69% to $7.0 billion in 2025.
- Its last three reported values are $7.0 billion in Q4 2025, $7.9 billion for Q3 2025, and $8.6 billion during Q2 2025.