Fuller H B (FUL) Construction in Progress (2016 - 2025)
Fuller H B's Construction in Progress history spans 12 years, with the latest figure at $153.8 million for Q4 2025.
- For Q4 2025, Construction in Progress rose 23.08% year-over-year to $153.8 million; the TTM value through Nov 2025 reached $153.8 million, up 23.08%, while the annual FY2025 figure was $153.8 million, 23.08% up from the prior year.
- Construction in Progress for Q4 2025 was $153.8 million at Fuller H B, up from $125.0 million in the prior quarter.
- Across five years, Construction in Progress topped out at $157.4 million in Q4 2023 and bottomed at $104.7 million in Q4 2021.
- The 5-year median for Construction in Progress is $133.0 million (2022), against an average of $134.8 million.
- The largest annual shift saw Construction in Progress soared 48.04% in 2021 before it dropped 20.58% in 2024.
- A 5-year view of Construction in Progress shows it stood at $104.7 million in 2021, then grew by 27.0% to $133.0 million in 2022, then rose by 18.32% to $157.4 million in 2023, then decreased by 20.58% to $125.0 million in 2024, then rose by 23.08% to $153.8 million in 2025.
- Per Business Quant, the three most recent readings for FUL's Construction in Progress are $153.8 million (Q4 2025), $125.0 million (Q4 2024), and $157.4 million (Q4 2023).