Growth Metrics

Formfactor (FORM) Construction in Progress (2016 - 2024)

Formfactor has reported Construction in Progress over the past 14 years, most recently at $66.1 million for Q2 2024.

  • For Q2 2024, Construction in Progress rose 2.32% year-over-year to $66.1 million; the TTM value through Jun 2024 reached $66.1 million, up 2.32%, while the annual FY2023 figure was $67.1 million, 41.46% up from the prior year.
  • Construction in Progress for Q2 2024 was $66.1 million at Formfactor, down from $69.7 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $69.7 million in Q1 2024 and troughed at $25.9 million in Q4 2021.
  • A 5-year average of $49.5 million and a median of $47.5 million in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: soared 281.48% in 2020 and later plummeted 44.28% in 2022.
  • Year by year, Construction in Progress stood at $45.2 million in 2020, then tumbled by 42.69% to $25.9 million in 2021, then surged by 83.07% to $47.5 million in 2022, then soared by 41.46% to $67.1 million in 2023, then fell by 1.52% to $66.1 million in 2024.
  • Business Quant data shows Construction in Progress for FORM at $66.1 million in Q2 2024, $69.7 million in Q1 2024, and $67.1 million in Q4 2023.