Fmc (FMC) Construction in Progress (2016 - 2025)
Fmc's Construction in Progress history spans 16 years, with the latest figure at $66.6 million for Q4 2025.
- On a quarterly basis, Construction in Progress fell 67.78% to $66.6 million in Q4 2025 year-over-year; TTM through Dec 2025 was $66.6 million, a 67.78% decrease, with the full-year FY2025 number at $66.6 million, down 67.78% from a year prior.
- Construction in Progress hit $66.6 million in Q4 2025 for Fmc, down from $206.7 million in the prior quarter.
- Over the last five years, Construction in Progress for FMC hit a ceiling of $206.7 million in Q4 2024 and a floor of $66.6 million in Q4 2025.
- Historically, Construction in Progress has averaged $159.9 million across 5 years, with a median of $175.9 million in 2022.
- Biggest five-year swings in Construction in Progress: skyrocketed 98.23% in 2021 and later plummeted 67.78% in 2025.
- Tracing FMC's Construction in Progress over 5 years: stood at $145.9 million in 2021, then rose by 20.56% to $175.9 million in 2022, then increased by 16.26% to $204.5 million in 2023, then increased by 1.08% to $206.7 million in 2024, then plummeted by 67.78% to $66.6 million in 2025.
- Business Quant data shows Construction in Progress for FMC at $66.6 million in Q4 2025, $206.7 million in Q4 2024, and $204.5 million in Q4 2023.