FutureFuel (FF) Construction in Progress (2016 - 2024)
Historic Construction in Progress for FutureFuel (FF) over the last 14 years, with Q4 2024 value amounting to $9.6 million.
- FutureFuel's Construction in Progress rose 43206.19% to $9.6 million in Q4 2024 from the same period last year, while for Dec 2024 it was $9.6 million, marking a year-over-year increase of 43206.19%. This contributed to the annual value of $9.6 million for FY2024, which is 43206.19% up from last year.
- Latest data reveals that FutureFuel reported Construction in Progress of $9.6 million as of Q4 2024, which was up 43206.19% from $1.8 million recorded in Q4 2023.
- FutureFuel's Construction in Progress' 5-year high stood at $9.6 million during Q4 2024, with a 5-year trough of $256000.0 in Q4 2020.
- Its 5-year average for Construction in Progress is $2.7 million, with a median of $1.0 million in 2021.
- As far as peak fluctuations go, FutureFuel's Construction in Progress crashed by 6037.15% in 2020, and later surged by 43206.19% in 2024.
- FutureFuel's Construction in Progress (Quarter) stood at $256000.0 in 2020, then soared by 300.0% to $1.0 million in 2021, then fell by 24.71% to $771000.0 in 2022, then soared by 134.63% to $1.8 million in 2023, then surged by 432.06% to $9.6 million in 2024.
- Its Construction in Progress was $9.6 million in Q4 2024, compared to $1.8 million in Q4 2023 and $771000.0 in Q4 2022.