Growth Metrics

FutureFuel (FF) Construction in Progress (2016 - 2025)

FutureFuel's Construction in Progress history spans 15 years, with the latest figure at $6.8 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 29.72% year-over-year to $6.8 million; the TTM value through Dec 2025 reached $6.8 million, down 29.72%, while the annual FY2025 figure was $6.8 million, 29.72% down from the prior year.
  • Construction in Progress reached $6.8 million in Q4 2025 per FF's latest filing, down from $9.6 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $9.6 million in Q4 2024 to a low of $771000.0 in Q4 2022.
  • Average Construction in Progress over 5 years is $4.0 million, with a median of $1.8 million recorded in 2023.
  • Peak YoY movement for Construction in Progress: surged 432.06% in 2024, then fell 29.72% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $1.0 million in 2021, then dropped by 24.71% to $771000.0 in 2022, then skyrocketed by 134.63% to $1.8 million in 2023, then soared by 432.06% to $9.6 million in 2024, then decreased by 29.72% to $6.8 million in 2025.
  • Per Business Quant, the three most recent readings for FF's Construction in Progress are $6.8 million (Q4 2025), $9.6 million (Q4 2024), and $1.8 million (Q4 2023).