Growth Metrics

Entegris (ENTG) Construction in Progress: 2011-2024

Historic Construction in Progress for Entegris (ENTG) over the last 14 years, with FY2024 value amounting to $356.1 million.

  • Entegris' Construction in Progress rose 1971.4% to $356.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $356.1 million, marking a year-over-year increase of 1971.4%. This contributed to the annual value of $356.1 million for FY2024, which is 1971.4% up from last year.
  • According to the latest figures from FY2024, Entegris' Construction in Progress is $356.1 million, which was up 1971.4% from $297.4 million recorded in FY2023.
  • In the past 5 years, Entegris' Construction in Progress registered a high of $465.9 million during FY2022, and its lowest value of $109.3 million during FY2020.
  • For the 5-year period, Entegris' Construction in Progress averaged around $281.2 million, with its median value being $297.4 million (2023).
  • Its Construction in Progress has fluctuated over the past 5 years, first surged by 16299.41% in 2022, then plummeted by 3615.94% in 2023.
  • Over the past 5 years, Entegris' Construction in Progress (Annual) stood at $109.3 million in 2020, then skyrocketed by 62.12% to $177.2 million in 2021, then surged by 162.99% to $465.9 million in 2022, then plummeted by 36.16% to $297.4 million in 2023, then grew by 19.71% to $356.1 million in 2024.
  • Its Construction in Progress was $356.1 million in FY2024, compared to $297.4 million in FY2023 and $465.9 million in FY2022.