KPIs & Operating Metrics(New)
Growth Metrics

Vaalco Energy (EGY) Construction in Progress (2018 - 2019)

Vaalco Energy (EGY) has disclosed Construction in Progress for 7 consecutive years, with $7.4 million as the latest value for Q4 2019.

  • On a quarterly basis, Construction in Progress rose 1321.58% to $7.4 million in Q4 2019 year-over-year; TTM through Dec 2019 was $7.4 million, a 1321.58% increase, with the full-year FY2019 number at $7.4 million, up 1321.58% from a year prior.
  • Construction in Progress was $7.4 million for Q4 2019 at Vaalco Energy, up from $5.3 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $23.7 million in Q2 2015 to a low of $519000.0 in Q4 2018.
  • A 3-year average of $7.3 million and a median of $3.7 million in 2015 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 98.36% in 2015, then skyrocketed 1321.58% in 2019.
  • Vaalco Energy's Construction in Progress stood at $2.1 million in 2015, then tumbled by 75.27% to $519000.0 in 2018, then surged by 1321.58% to $7.4 million in 2019.
  • Per Business Quant, the three most recent readings for EGY's Construction in Progress are $7.4 million (Q4 2019), $5.3 million (Q3 2019), and $1.0 million (Q2 2019).