KPIs & Operating Metrics(New)
Growth Metrics

Vaalco Energy (EGY) Construction in Progress (2018 - 2019)

Vaalco Energy (EGY) has disclosed Construction in Progress for 8 consecutive years, with $7.4 million as the latest value for Q4 2019.

  • Quarterly Construction in Progress rose 1321.58% to $7.4 million in Q4 2019 from the year-ago period, while the trailing twelve-month figure was $7.4 million through Dec 2019, up 1321.58% year-over-year, with the annual reading at $7.4 million for FY2019, 1321.58% up from the prior year.
  • Construction in Progress for Q4 2019 was $7.4 million at Vaalco Energy, up from $5.3 million in the prior quarter.
  • The five-year high for Construction in Progress was $23.7 million in Q2 2015, with the low at $519000.0 in Q4 2018.
  • Average Construction in Progress over 3 years is $7.3 million, with a median of $3.7 million recorded in 2015.
  • The sharpest move saw Construction in Progress crashed 98.36% in 2015, then surged 1321.58% in 2019.
  • Over 3 years, Construction in Progress stood at $2.1 million in 2015, then crashed by 75.27% to $519000.0 in 2018, then soared by 1321.58% to $7.4 million in 2019.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $7.4 million, $5.3 million, and $1.0 million for Q4 2019, Q3 2019, and Q2 2019 respectively.