Vaalco Energy (EGY) Construction in Progress (2018 - 2019)
Historic Construction in Progress for Vaalco Energy (EGY) over the last 7 years, with Q4 2019 value amounting to $7.4 million.
- Vaalco Energy's Construction in Progress rose 132158.0% to $7.4 million in Q4 2019 from the same period last year, while for Dec 2019 it was $7.4 million, marking a year-over-year increase of 132158.0%. This contributed to the annual value of $7.4 million for FY2019, which is 132158.0% up from last year.
- Per Vaalco Energy's latest filing, its Construction in Progress stood at $7.4 million for Q4 2019, which was up 132158.0% from $5.3 million recorded in Q3 2019.
- In the past 5 years, Vaalco Energy's Construction in Progress registered a high of $23.7 million during Q2 2015, and its lowest value of $519000.0 during Q4 2018.
- Its 3-year average for Construction in Progress is $7.3 million, with a median of $3.7 million in 2015.
- Per our database at Business Quant, Vaalco Energy's Construction in Progress plummeted by 9835.73% in 2015 and then soared by 132158.0% in 2019.
- Vaalco Energy's Construction in Progress (Quarter) stood at $2.1 million in 2015, then plummeted by 75.27% to $519000.0 in 2018, then surged by 1321.58% to $7.4 million in 2019.
- Its Construction in Progress stands at $7.4 million for Q4 2019, versus $5.3 million for Q3 2019 and $1.0 million for Q2 2019.