KPIs & Operating Metrics(New)
Growth Metrics

Vaalco Energy (EGY) Construction in Progress (2018 - 2019)

Vaalco Energy has reported Construction in Progress over the past 8 years, most recently at $7.4 million for Q4 2019.

  • Quarterly Construction in Progress rose 1321.58% to $7.4 million in Q4 2019 from the year-ago period, while the trailing twelve-month figure was $7.4 million through Dec 2019, up 1321.58% year-over-year, with the annual reading at $7.4 million for FY2019, 1321.58% up from the prior year.
  • Construction in Progress was $7.4 million for Q4 2019 at Vaalco Energy, up from $5.3 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $23.7 million in Q2 2015 and troughed at $519000.0 in Q4 2018.
  • The 3-year median for Construction in Progress is $3.7 million (2015), against an average of $7.3 million.
  • Year-over-year, Construction in Progress tumbled 98.36% in 2015 and then skyrocketed 1321.58% in 2019.
  • A 3-year view of Construction in Progress shows it stood at $2.1 million in 2015, then plummeted by 75.27% to $519000.0 in 2018, then skyrocketed by 1321.58% to $7.4 million in 2019.
  • Per Business Quant, the three most recent readings for EGY's Construction in Progress are $7.4 million (Q4 2019), $5.3 million (Q3 2019), and $1.0 million (Q2 2019).