KPIs & Operating Metrics(New)
Growth Metrics

Brinker International (EAT) Construction in Progress (2016 - 2025)

Brinker International (EAT) has disclosed Construction in Progress for 16 consecutive years, with $53.4 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 21.01% to $53.4 million in Q4 2025 year-over-year; TTM through Dec 2025 was $53.4 million, a 21.01% decrease, with the full-year FY2025 number at $71.8 million, up 75.12% from a year prior.
  • Construction in Progress was $53.4 million for Q4 2025 at Brinker International, down from $53.7 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $116.6 million in Q1 2025 to a low of $14.5 million in Q1 2021.
  • A 5-year average of $41.2 million and a median of $34.6 million in 2022 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: tumbled 47.84% in 2021, then skyrocketed 256.57% in 2025.
  • Brinker International's Construction in Progress stood at $19.7 million in 2021, then skyrocketed by 156.35% to $50.5 million in 2022, then tumbled by 33.66% to $33.5 million in 2023, then skyrocketed by 101.79% to $67.6 million in 2024, then decreased by 21.01% to $53.4 million in 2025.
  • Per Business Quant, the three most recent readings for EAT's Construction in Progress are $53.4 million (Q4 2025), $53.7 million (Q3 2025), and $71.8 million (Q2 2025).