Chipotle Mexican Grill (CMG) Construction in Progress (2017 - 2019)
Chipotle Mexican Grill (CMG) has disclosed Construction in Progress for 3 consecutive years, with $45.4 million as the latest value for Q4 2019.
- On a quarterly basis, Construction in Progress rose 6.07% to $45.4 million in Q4 2019 year-over-year; TTM through Dec 2019 was $45.4 million, a 6.07% increase, with the full-year FY2019 number at $45.4 million, up 6.07% from a year prior.
- Construction in Progress was $45.4 million for Q4 2019 at Chipotle Mexican Grill, up from $42.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $45.4 million in Q4 2019 to a low of $41.9 million in Q4 2017.
- A 3-year average of $43.4 million and a median of $42.8 million in 2018 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: rose 2.27% in 2018, then rose 6.07% in 2019.
- Chipotle Mexican Grill's Construction in Progress stood at $41.9 million in 2017, then increased by 2.27% to $42.8 million in 2018, then rose by 6.07% to $45.4 million in 2019.
- Per Business Quant, the three most recent readings for CMG's Construction in Progress are $45.4 million (Q4 2019), $42.8 million (Q4 2018), and $41.9 million (Q4 2017).