Daqo New Energy (DQ) Construction in Progress (2011 - 2012)

Daqo New Energy (DQ) reported Construction in Progress of $19.3 million for Q4 2012, down 92.08% YoY from $243.6 million in Q1 2012, and down 92.08% on a QoQ basis from $243.6 million in Q4 2011.

Daqo New Energy (DQ) Construction in Progress (2011 - 2012) Analysis & Trends

Daqo New Energy has reported Construction in Progress for 2 years, with the latest figure at $19.3 million in Q4 2012.

  • Construction in Progress for Q4 2012 came in at $19.3 million, down 92.08% year-over-year; the trailing twelve-month figure through Dec 2012 was $19.3 million (down 92.08% YoY), and the FY2012 annual result was $19.3 million, down 92.08% from the prior year.
  • Construction in Progress came in at $19.3 million for Q4 2012 at Daqo New Energy, down from $243.6 million in the prior quarter.
  • The five-year high for Construction in Progress was $243.6 million in Q4 2011, with the low at $19.3 million in Q4 2012.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Asml Holding 636.08 Bn 620.57 Bn 5.90 Bn 2.06 Bn
2 Applied Materials 406.04 Bn 399.30 Bn 3.95 Bn -
3 Lam Research 369.24 Bn 364.49 Bn 2.91 Bn -
4 Kla 240.65 Bn 238.86 Bn 2.09 Bn 220.76 Mn
5 Teradyne 58.07 Bn 57.82 Bn 780.95 Mn -
6 Qnity Electronics 27.70 Bn 26.85 Bn 618.00 Mn -
7 Entegris 18.25 Bn 17.80 Bn 380.80 Mn -
8 Onto Innovation 12.83 Bn 12.17 Bn 146.39 Mn -
9 Amkor Technology 12.41 Bn 9.90 Bn 318.59 Mn -
10 Daqo New Energy 4.12 Bn 2.85 Bn -139.37 Bn -

Historic Data

Download Data
DateValue
Dec 31, 2012 19.30 Mn
Dec 31, 2011 243.61 Mn