KPIs & Operating Metrics(New)
Growth Metrics

Dominos Pizza (DPZ) Construction in Progress (2016 - 2025)

Dominos Pizza (DPZ) has disclosed Construction in Progress for 15 consecutive years, with $46.2 million as the latest value for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 103.3% to $46.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $46.2 million, a 103.3% increase, with the full-year FY2025 number at $46.2 million, up 103.3% from a year prior.
  • Construction in Progress was $46.2 million for Q4 2025 at Dominos Pizza, up from $15.8 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $46.2 million in Q4 2025 to a low of $9.6 million in Q2 2021.
  • A 5-year average of $19.6 million and a median of $16.3 million in 2025 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: crashed 75.4% in 2021, then soared 181.46% in 2022.
  • Dominos Pizza's Construction in Progress stood at $10.3 million in 2021, then surged by 161.19% to $26.9 million in 2022, then dropped by 8.82% to $24.5 million in 2023, then fell by 7.3% to $22.7 million in 2024, then skyrocketed by 103.3% to $46.2 million in 2025.
  • Per Business Quant, the three most recent readings for DPZ's Construction in Progress are $46.2 million (Q4 2025), $15.8 million (Q3 2025), and $13.1 million (Q2 2025).