KPIs & Operating Metrics(New)
Growth Metrics

Dominos Pizza (DPZ) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Dominos Pizza (DPZ) over the last 17 years, with Q3 2025 value amounting to $15.8 million.

  • Dominos Pizza's Construction in Progress rose 1598.47% to $15.8 million in Q3 2025 from the same period last year, while for Sep 2025 it was $15.8 million, marking a year-over-year increase of 1598.47%. This contributed to the annual value of $22.7 million for FY2024, which is 729.65% down from last year.
  • Latest data reveals that Dominos Pizza reported Construction in Progress of $15.8 million as of Q3 2025, which was up 1598.47% from $13.1 million recorded in Q2 2025.
  • Dominos Pizza's 5-year Construction in Progress high stood at $27.8 million for Q1 2022, and its period low was $9.6 million during Q2 2021.
  • In the last 5 years, Dominos Pizza's Construction in Progress had a median value of $16.3 million in 2023 and averaged $18.3 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 7540.07% in 2021, then skyrocketed by 18146.11% in 2022.
  • Dominos Pizza's Construction in Progress (Quarter) stood at $10.3 million in 2021, then skyrocketed by 161.19% to $26.9 million in 2022, then decreased by 8.82% to $24.5 million in 2023, then dropped by 7.3% to $22.7 million in 2024, then crashed by 30.62% to $15.8 million in 2025.
  • Its Construction in Progress was $15.8 million in Q3 2025, compared to $13.1 million in Q2 2025 and $16.3 million in Q1 2025.