Dominos Pizza (DPZ) Construction in Progress (2016 - 2025)
Dominos Pizza (DPZ) has disclosed Construction in Progress for 15 consecutive years, with $46.2 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 103.3% to $46.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $46.2 million through Dec 2025, up 103.3% year-over-year, with the annual reading at $46.2 million for FY2025, 103.3% up from the prior year.
- Construction in Progress for Q4 2025 was $46.2 million at Dominos Pizza, up from $15.8 million in the prior quarter.
- The five-year high for Construction in Progress was $46.2 million in Q4 2025, with the low at $9.6 million in Q2 2021.
- Average Construction in Progress over 5 years is $19.6 million, with a median of $16.3 million recorded in 2025.
- The sharpest move saw Construction in Progress plummeted 75.4% in 2021, then skyrocketed 181.46% in 2022.
- Over 5 years, Construction in Progress stood at $10.3 million in 2021, then soared by 161.19% to $26.9 million in 2022, then decreased by 8.82% to $24.5 million in 2023, then dropped by 7.3% to $22.7 million in 2024, then surged by 103.3% to $46.2 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $46.2 million, $15.8 million, and $13.1 million for Q4 2025, Q3 2025, and Q2 2025 respectively.